NEPA. To support DOE’s preparation of its EIS, the Alliance will collect the required environmental data regarding the Candidate Site(s). In addition, for each Candidate Site, the Alliance will identify one or more potential CO2 pipeline corridors between the Meredosia site and the Preferred Site (and back-up site). For each of these corridors, the Alliance will collect information regarding potential impacts to environmental resources along those corridors. The Alliance will prepare and submit to DOE an Environmental Information Volume for use in preparing the EIS. If existing site characterization information is required, as part of the site evaluation process, a 2D seismic survey will be performed (i.e., at the most qualified candidate sites). The intent of conducting 2D seismic surveys during the site evaluation and selection process is to provide site- specific information to help qualify each site. Specifically, the seismic survey data will provide information about the approximate depth, thickness and lateral continuity of the potential reservoirs and seals at the site and the presence or absence of faults and/or fractures that could interfere with the goal of permanent storage. Depending on the location of the site, existing 2D seismic data may also be available to augment the planned survey. After a site is selected, the Alliance may choose to do additional characterization (e.g., drill a characterization well into the target storage formation) to inform the NEPA process. Acceleration of site-specific activities may be considered and such activities will be proposed to DOE in advance of execution. Upon approval by the DOE, accelerated site-specific activities will be conducted to the extent that sufficient funding and resources are available, • Deliver Initial Environmental Data to NEPA Contractor – March 31, 2011 • Complete Seismic Survey to Support Site Selection – February 10, 2011 • Preliminary Seismic Survey Data Analysis – February 18, 2011 • Final Seismic Survey Data Analysis – March 31, 2011 • Review preliminary draft sections of the EIS for accuracy and consistency – TBD • Develop materials for use in public information workshops preceding the Draft EIS hearings and identify potential speakers at the hearings – TBD
Appears in 2 contracts
Sources: Assistance Agreement, Assistance Agreement