Necessary Design Modifications. ‌ 7.3.1 If the Owner elects to suspend or terminate the Project pursuant to Section 7.2 .1 (a) above or to authorize rebidding pursuant to Section 7.2 .2(b) above, the Design Professional shall take all appropriate action to assist the Owner at no additional cost to the Owner. 7.3.2 If the Owner decides to increase funding partially or wholly to adjust for bids greater than the Design Professional’s pre-bid cost estimate as provided in Section 7.2.3 (c) above, the Design Professional will revise the Contract Documents appropriately at no additional cost to the Owner and the total fee for architectural/engineering services shall not exceed the Basic Lump Sum Fee. 7.3.3 In the case of Section 7.2 .4(d) above, the Design Professional shall modify the Contract Documents as necessary to bring the Construction Costs within the Fixed Limit of Construction Cost without additional cost to the Owner, and the total fee for architectural/engineering services shall not exceed the Basic Lump Sum Fee.

Appears in 1 contract

Sources: Owner and Design Professional Agreement

Necessary Design Modifications. 7.3.1 If the Owner elects to suspend or terminate the Project pursuant to Section Section 7.2 .1 (a) above or to authorize rebidding pursuant to Section 7.2 .2(b(b) above, the Design Professional shall take all appropriate action to assist the Owner at no additional cost to the Owner. 7.3.2 If the Owner decides to increase funding partially or wholly to adjust for bids greater than the Design Professional’s pre-bid cost estimate as provided in Section 7.2.3 7.2 (c) above, the Design Professional will revise the Contract Documents appropriately at no additional cost to the Owner and the total fee for architectural/engineering services shall not exceed the Basic Lump Sum Fee. 7.3.3 In the case of Section 7.2 .4(d(d) above, the Design Professional shall modify the Contract Documents as necessary to bring the Construction Costs within the Fixed Limit of Construction Cost without additional cost to the Owner, and the total fee for architectural/engineering services shall not exceed the Basic Lump Sum Fee.

Appears in 1 contract

Sources: Owner and Design Professional Agreement