Minimum Load Capability. The Facility shall allow for a net minimum load capability under remote dispatch of seven (7) MW at Company’s sole discretion as necessary due to system constraints, system balancing and frequency control. The output of the Facility may be directed to operate at less than the net minimum load capability of seven (7) MW by instruction from the Company System Operator under disturbances or other unusual operating conditions which could be mitigated or addressed by the reduction of the Facility in the judgment of the Company System Operator, such as, but not limited to: excess energy conditions due to abnormal operating conditions such as could be caused by unexpected loss of load, system over-frequency, transmission equipment overload or risk of transmission overloads due to contingencies, and high voltages in the vicinity of the interconnection.
Minimum Load Capability. The Facility shall allow for a minimum load capability under remote dispatch of twenty (20)
Minimum Load Capability. The Facility shall allow for a net zero minimum load capability at Company’s sole discretion as necessary due to system constraints, system balancing and frequency control.
Minimum Load Capability. Subject to the Dispatch Constraints, when on- line, the Facility shall provide the following net minimum load capability: one (1) CT, Simple Cycle mode - five (5) MW; one (1) CT, combined cycle mode - seven (7) MW; two (2) CTs, Simple Cycle mode - ten (10) MW; two (2) CTs, combined cycle mode - sixteen (16)
Minimum Load Capability. 35 (10) Short Circuit Ratio............................................. 35 (11) Open Circuit Transient Field Time Constant...................... 35 (12) Generator Step-Up Transformer Impedance......................... 35 (13) Response Ratio.................................................. 35 (14) Ceiling Voltage................................................. 35 ii