Microwave. 2.1 Where microwave systems are required to be used by Operator in terms of the Interconnection Agreement: 2.1.1 The Operator shall install SDH microwave systems with a minimum capacity of 2xSTM-1 using its own frequency band at POI at which it is connected. 2.1.2 The links shall be established as per the ITU-T standard G.803. 2.1.3 The frequency used shall be licensed and approved by the relevant regulatory authorities with all associated fees paid by the Operator. 2.1.4 The interface with PMCL equipment shall be at E1 level or at any other level as agreed by the Parties. 2.1.5 The Operator shall provide a detailed link engineering plan to PMCL at least fifteen (15) Calendar Days before the actual implementation. 2.1.6 All on site cable laying shall be done as specified by PMCL.
Appears in 5 contracts
Sources: Interconnection Agreement, Interconnect Agreement, Interconnection Agreement