Metering and Telemetry Sample Clauses

Metering and Telemetry a) Except as may be otherwise specifically provided for herein, electrical meters and associated equipment of the type approved by MSEDCL, which meters and equipment shall be installed on Generator’s premises at their cost and thereon owned, installed, operated and maintained by MSEDCL. Generator shall, at its own expense, furnish, install and maintain mounting facilities for such meters and associated devices located in the Dedicated Facilities. The Generator shall construct air-conditioned metering cabin of size 3.5 x 3.5 meter for housing energy and tariff metering. Special Energy Meters (ABT) with online reading features having continuous communication facility with SLDC shall be installed at the metering point. The utility / licensee, if opted for by the co-gen project entity, shall provide check meter, with identical specifications to that of main billing meter having independent CTs &PTs, at the cost of the project holder, to assess the energy generated and fed into the grid during such period when the main meter or its related accessories such as CT/PT fail or develop problems, so as to avoid disputes in future. Generator’s and MSEDCL’s electric metering equipment shall be sealed and the seals shall be broken only upon occasions when the meters are to be inspected, tested or calibrated before the representatives of Generator and MSEDCL , who shall be present upon such occasions. Normal inspection, testing and calibration shall be performed once a year, or at Generator’s expense, at more frequent intervals.
AutoNDA by SimpleDocs
Metering and Telemetry. Idaho Power shall, for the account of Seller, provide, install, and maintain Metering Equipment as required to determine the amount of Net Energy and Inadvertent Energy delivered to Idaho Power by the Transmitting Entity at the Point of Delivery. The metering will be installed at the location as specified in Appendix B of this Agreement. If required by Idaho Power, metering will also include measurement of kilovar-hours in a manner agreed to by both Parties. All customary and reasonable Metering Equipment and installation costs shall be borne by Seller, including costs incurred by Idaho Power for inspecting and testing such equipment at reasonable intervals at Idaho Power's actual cost of providing this Metering Equipment and services. All meters used to determine the billing hereunder shall be sealed and the seals shall be broken only by Idaho Power when the meters are to be inspected, tested or adjusted.
Metering and Telemetry a) Special Energy Meters (ABT) with online reading features having continuous communication facility with SLDC/ MSEDCL shall be installed at the metering point. The utility / licensee, if opted for by the co-gen project entity, shall provide check meter, with identical specifications to that of main billing meter having independent CTs &PTs, at the cost of the project holder, to assess the energy generated and fed into the grid during such period when the main meter or its related accessories such as CT/PT fail or develop problems, so as to avoid disputes in future. Generator’s and MSEDCL’s electric metering equipment shall be sealed and the seals shall be broken only upon occasions when the meters are to be inspected, tested or calibrated before the representatives of Generator and MSEDCL , who shall be present upon such occasions. Normal inspection, testing and calibration shall be performed once a year, or at Generator’s expense, at more frequent intervals.
Metering and Telemetry. The Cooperative shall be reimbursed for all costs of interconnection, including direct and indirect expenses related to metering and telemetry costs when needed, incurred by the Cooperative in connecting the Member generation facility to the distribution system. Metering shall meet accuracy standards required for equivalent electrical services and can be accomplished with standard meters or any devices that meet data collection and accuracy requirements. Recurring maintenance expenses incurred through the power or transmission supplier will be billed to the Member on an actual cost basis.
Metering and Telemetry. All electric metering associated with a Solar Facility including the Project Meter, whether owned by PPAC or a third party, shall be installed, operated, maintained, and tested by or on behalf of PPAC in accordance with Good Utility Practices, and any applicable OFFTAKER technical requirements and standards.
Metering and Telemetry a. Except as may be otherwise specifically provided for herein, electrical meters and associated equipment of the type approved by MSEDCL, which meters and equipment shall be installed on Generator’s premises at their cost and thereon owned, installed, operated and maintained by MSEDCL. Generator shall, at its own expense, furnish, install and maintain mounting facilities for such meters and associated devices located in the Dedicated Facilities. The Generator shall construct air-conditioned metering cabin of size 3.5 x 3.5 meter for housing energy and tariff metering.
Metering and Telemetry. The Buyer shall provide, install, and maintain Metering and Telemetry Equipment to be located at the Metering Point to accurately calculate the actual energy deliveries from the Seller to the Transmitting Entity at the Metering Point and provide continuous telemetry information from the Facility to the Buyer. The Metering and Telemetry Equipment shall be of the type required to accurately measure, record and report the energy to provide the Buyer adequate Net Energy and Test Energy measurement data to administer this Agreement and to integrate the Facility’s energy into the Buyer’s electrical system. The Seller shall be responsible for all costs of the actual Metering and Telemetry Equipment, installation, inspections, maintenance and testing costs.
AutoNDA by SimpleDocs

Related to Metering and Telemetry

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Points of Interconnection and Trunk Types 2.1 Point(s) of Interconnection.

  • Point of Interconnection The Point of Interconnection shall be as identified on the one-line diagram attached as Schedule B to this ISA.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Ordering and Provisioning 53.1 National Exchange Access Center (NEAC)