Measurement Data Sample Clauses

Measurement Data. 2.1 If the Service Provider fails to provide the Measurement Data for a Settlement Month by the corresponding Data Submission Deadline, or fails to provide any required corrections to the Measurement Data by the Corrected Data Submission Deadline, the Contract Payment for such Settlement Month shall be equal to zero. – End of Section
AutoNDA by SimpleDocs
Measurement Data. Gatherer will make available to Producers, including through electronic access as available, information containing the previous Day’s volumes (MMBTU) and a spot flow rate in MMBTU/Day at the time of the latest poll of the measurement station. All such information for a Day will be provided by Gatherer on or before two (2) hours after the end of such Day, unless Gatherer is unable to do so for reasons beyond its reasonable control, in which case Gatherer will provide Producers such data as soon as reasonably practicable under the circumstances.
Measurement Data. 18 deflection values measured at site with the small-plate light falling weight deflectometer, adjusted parameters, gauge ID, measuring method, sign and date, which the deflectometer stores in its data storing until its cancelling.
Measurement Data. (a) Allocated Producers Data. Gatherer will make available to Producers, including through electronic access as available, information containing Producers’ previous Day’s volumes (in MMBTU) delivered to each Receipt Point, as well as daily Gas Lift Gas information for each Receipt Point. Gatherer will also provide Producers, including through electronic access as available, access to its preliminary daily measurement data for the Day that Dedicated Gas was actually received at each Receipt Point as allocated by the Dedicated Gas flow in MMBTU/Day to help Producers minimize Imbalances. All such information for a Day will be provided by Gatherer on or before forty-eight (48) hours after the end of such Day, unless Gatherer is unable to do so for reasons beyond its reasonable control, in which case Gatherer will provide Producers such data as soon as reasonably practicable under the circumstances. SPECIFIC TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN SEPARATELY FILED WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**).
Measurement Data. To the extent provided to Buyer by the Downstream Facility and solely when Producer is the sole seller of Product to Buyer for transportation using the Buyer Capacity, Buyer shall provide, or cause to be provided, daily RoseRock Scada Tank/Meter data for receipts at Origin Points for prior day’s data. If requested by Producer, Buyer shall request the Downstream Facility provide, at Producer’s cost, access to real-time measurement data at the Origin Points, including volume, gravity, average flowing temperature, average flowing pressure and other reasonably requested and available measurement data.
Measurement Data. The standard measure of area in the real estate market in Mexico is the square meter (m2), while in the United States the standard measure is the square foot (sq. ft.). Unless otherwise specified, all units of area shown in this document are expressed in terms of square feet. Ten square feet is equal to approximately 0.929 square meters. Certain percentages and totals may not sum due to rounding. ANNEX “A” NOTICES TO HOLDERS Notice to Holders in the United States The CBFIs have not been, nor will be, registered under the Securities Act, any other U.S. federal or state or non-U.S. securities laws or the laws of any non-U.S. jurisdiction other than Mexico. The CBFIs will not be registered under the Securities Act in reliance upon the exemption contained in section 4(a)(2) of the Securities Act and in Rule 506 of Regulation D or Regulation S promulgated thereunder or other applicable exemptions promulgated under the Securities Act. Holders in the United States may only participate in the subscription if they are “accredited investors” as defined under Regulation D under the Securities Act and Holders outside the United States only if they are non- U.S. persons and in reliance on Regulation S under the Securities Act. Notice to Holders in the European Economic Area
Measurement Data. (a) Allocated Producers Data. Gatherer will make available to Producers, including through electronic access as available, information containing Producers’ previous Day’s volumes (in MMBTU) delivered to each Receipt Point, as well as daily Gas Lift Gas information for each Receipt Point. Gatherer will also provide Producers, including through electronic access as available, access to its preliminary daily measurement data for the Day that Dedicated Gas was actually received at each Receipt Point as allocated by the Dedicated Gas flow in MMBTU/Day to help Producers minimize Imbalances. All such information for a Day will be provided by Gatherer on or before forty-eight (48) hours after the end of such Day, unless Gatherer is unable to do so for reasons beyond its reasonable control, in which case Gatherer will provide Producers such data as soon as reasonably practicable under the circumstances.
AutoNDA by SimpleDocs
Measurement Data. Gatherer, or its designee, shall be solely responsible for obtaining all necessary measurement data concerning Gatherer’s receipts of Shipper’s Gas at the Point of Receipt hereunder. The quantity of Gas measured at the Point of Measurement shall be measured in accordance with the provisions of Article IV of Exhibit C, subject to the receipt of all necessary regulatory approvals.
Measurement Data. Carrier shall provide Producer, at no cost to Producer, a port to receive all measurement data generated at each individual Receipt Point and Delivery Point and Carrier will utilize this data to manage the nomination, allocation and billing procedures related to Carrier’s services provided hereunder. In addition, all data collected in Carrier’s SCADA system shall be made available to Producer in electronic form on a continuous, real-time basis.

Related to Measurement Data

  • Measurement Should the State terminate this contract as herein provided, no fees other than fees due and payable at the time of termination shall thereafter be paid to the Engineer. In determining the value of the work performed by the Engineer prior to termination, the State shall be the sole judge. Compensation for work at termination will be based on a percentage of the work completed at that time. Should the State terminate this contract under paragraph (4) or (5) above, the Engineer shall not incur costs during the thirty-day notice period in excess of the amount incurred during the preceding thirty days.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Performance Measurement Satisfactory performance of this Contract will be measured by:

  • PERFORMANCE MEASUREMENTS Upon a particular Commission’s issuance of an Order pertaining to Performance Measurements in a proceeding expressly applicable to all CLECs generally, BellSouth shall implement in that state such Performance Measurements as of the date specified by the Commission. Performance Measurements that have been Ordered in a particular state can currently be accessed via the internet at xxxx://xxxx.xxxxxxxxx.xxx. The following Service Quality Measurements (SQM) plan as it presently exists and as it may be modified in the future, is being included as the performance measurements currently in place for the state of Tennessee. At such time that the TRA issues a subsequent Order pertaining to Performance Measurements, such Performance Measurements shall supersede the SQM contained in the Agreement. BellSouth Service Quality Measurement Plan‌ (SQM) Tennessee Performance Metrics Measurement Descriptions Version 2.00 Issue Date: July 1, 2003 Introduction

  • Performance Data In accordance with section 34(2)(n) of the Act the EMHS is required to provide performance data for the monthly production of the performance reports as required by the Department CEO.

  • Measurement and Monitoring Tools Contractor shall implement measurement and monitoring tools and procedures reasonably designed to measure its performance of the Services and assess such performance against any applicable service levels. Contractor shall provide LAUSD with a monthly report of service level performance under any applicable Work Order. Upon LAUSD’s request, Contractor shall provide LAUSD with access to the measurement and monitoring tools described herein, and to any information that they generate.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Measurements All production shall be accurately measured using standards established by the American Gas Association (AGA) and/or the American Petroleum Institute (API) and all measuring devices shall be tamper proof as nearly as possible. Oil royalties due within the terms of this lease shall be calculated on actual and accurate measurements within API standards unless a different means of measurement, subject to Lessor's approval, is provided.

  • Measurement method An isolation resistance test instrument is connected between the live parts and the electrical chassis. The isolation resistance is subsequently measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in conductively connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those components disconnected.

Time is Money Join Law Insider Premium to draft better contracts faster.