Maximum Cost Limit Sample Clauses
Maximum Cost Limit. Prior to authorizing the Consultant to proceed with preparation of Construction Document Development, the City shall establish and communicate to the Consultant, a maximum sum for the cost of construction of the Project ("Maximum Cost Limit"). If the City has not advertised for bids within ninety (90) days after the Consultant submits the Final Design to the City, the estimate of the cost of construction shall be adjusted by Consultant. Notwithstanding anything above to the contrary, the City may require the Consultant to revise and modify Construction Documents and assist in the re-bidding of the Work at no additional cost or fee to the City if all responsive and responsible bids received exceed ten (10%) percent of the Maximum Cost Limit.
Maximum Cost Limit. Prior to authorizing the Consultant to proceed with preparation of Construction Document Development, the Omni CRA shall establish and communicate to the Consultant, a maximum sum for the cost of construction of the Project ("Maximum Cost Limit"). If the Omni CRA has not advertised for bids within ninety (90) days after the Consultant submits the Final Design to the Omni CRA, the estimate of the cost of construction shall be adjusted by Consultant. Notwithstanding anything above to the contrary, the Omni CRA may require the Consultant to revise and modify Construction Documents and assist in the re-bidding of the Work at no additional cost or fee to the City if all responsive and responsible bids received exceed ten (10%) percent of the Maximum Cost Limit.
Maximum Cost Limit. Prior to authorizing the Consultant to proceed with the commencement of the Basic Services, the Town will notify the Consultant of the maximum for the cost of construction of the Project ("Maximum Cost Limit"). Consultant, if necessary, at no cost to the Town will make revisions to the drawings to maintain the cost of construction within the Maximum Cost Limit.