Common use of Major Maintenance Clause in Contracts

Major Maintenance. Major Maintenance and repair activity shall include but is not limited to items listed below: 1) The COUNTY shall perform the Major Maintenance described in this Section C-3 (B) (1) at the sole expense of the COUNTY. • Vertical well raising, lowering as a result of Landfill construction and operation • Relocation or abandonment of ▇▇▇▇▇ as a result of Landfill construction and operation • Abandonment of noncompliant or pinched ▇▇▇▇▇ as a result of normal Landfill settlement • Header/sub-header relocation or abandonment as a result of Landfill construction and operation • Replacement and pipe resizing of header/sub-header to accommodate enough Landfill Gas flow capacity to satisfy emission requirements • Repair of header/subheader, valves and laterals impacted by normal or incidental Landfill operations. • Maintain and re-grade existing access roads for ingress and egress for the purpose of operating, adjusting, controlling, and monitoring Collection System • Replacement or repair of defective main isolation valves (10”-36” diameter) below grade impacted by incidental Landfill operations • Provide Accu-flo wellhead major components • Provide valve or major components for above and below grade valves replacement or repair (4” – 36” diameter), such as gear assembly, valve stems, and valve wheel/lever, as a result of normal wear and tear or landfill settlement • Provide parts and materials for vault installation and repair. 2) ▇▇▇▇▇▇▇▇ POWER shall perform the Major Maintenance described in this Section C-3 (B) (2) at the sole expense of ▇▇▇▇▇▇▇▇ POWER. • Replacement or repair of defective Accu-flo and /or existing well heads or the major components (new wellheads and major parts to be provided by COUNTY, excludes flexible hose, plugs, and sampling ports) • Replacement or maintenance of above and below grade valves (4” – 36” dia.) or its major components as a result of normal wear and tear (parts to be provided by COUNTY) o The COUNTY to provide equipment (and operator as required) regularly located at the landfill, when available. • Pumping of flooded vertical ▇▇▇▇▇ caused by condensate build-up • Filling and flushing of drain lines, main valves, header/sub-header, laterals, and traps blockage caused by silt or debris build-up o The COUNTY to provide equipment (and operator as required) regularly located at the landfill, when available. • Vault installation and repair (COUNTY to provide parts/vault)

Appears in 2 contracts

Sources: Landfill Gas Rights & Production Facilities Agreement, Landfill Gas Rights & Production Facilities Agreement