Machine Capability Cm A1 Sample Clauses

Machine Capability Cm A1. 1 Cmk 设备能力 Cm,Cmk 1.01 The Cm index describes machine capability; it is the number of times the spread of the machine fits into the tolerance width. The higher the value of Cm, the better the machine. The Cmk index is used to study the position of the machine’s capability in relation to the tolerance limits, which describes the capability corrected for position. It is not much use having a high Cm index if the machine setting is way off center in relation to the middle of the tolerance range. A high Cmk index means, then, that it is a good machine with a small spread in relation to the tolerance width, and also that it is well centered within that width. A1. 1.01 Cm 指数体现了设备能力,是设备能力相对于公差宽度分布(标准差)的倍数。设备能力值越高,设备越好。Cmk 指数用于研究设备能力相对于公差极限的位置,其描述了针对位置修正的能力。如果设备设置偏离公差带中值, 那么即使 Cm 指数很高,但并不代表设备能力高。高的 Cmk 值意味着一台好的设备,在相对于公差宽度内的分 布很窄,并且位于公差带中心。 A1.1.02 A1.1.02 Cmk Index shall usually be ≥ 2,00 and shall be calculated considering a control chart with typically 50 consecutively produced parts per cavity. Different Cmk target or data collection process can be required A1.1.02 设备能力指数通常应≥ 2,00,并且通常应每腔连续取样 50 件,参考控制图的结果来计算。根据不同 OEM 规范 by RÖCHLING based on OEM specification. 要求,劳士领将提出采用不同的设备能力指数目标值或是数据收集过程的要求。
Machine Capability Cm A1. 1 Cmk 设备能力 Cm,Cmk

Related to Machine Capability Cm A1

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as all line-side and trunk-side facilities, plus the features, functions, and capabilities of the switch. The features, functions, and capabilities of the switch shall include the basic switching function of connecting lines to lines, lines to trunks, trunks to lines, and trunks to trunks. Local circuit switching includes all vertical features that the switch is capable of providing, including custom calling, custom local area signalling service features, and Centrex, as well as any technically feasible customized routing functions. 4.2.2 Notwithstanding BellSouth’s general duty to unbundle local circuit switching, BellSouth shall not be required to unbundle local circuit switching for ▇▇▇▇ when ▇▇▇▇: (1) serves an End User with four (4) or more voice-grade (DS0) equivalents or lines served by BellSouth in Zone 1 of one of the following MSAs: Atlanta, GA;

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Electrical Provide drawings for the following systems: .1 Lighting including circuiting and luminaire identification and switching. Also provide illuminance computer printout for all indoor typical indoor spaces and parking lots. .2 Convenience outlets and circuiting, special outlets and circuiting, television outlets, and power systems and equipment. Provide riser diagrams for all electrical systems including master clock, intercom, fire alarm, ITV, computer networking/telephone. Also, provide for emergency and normal power distribution. Provide luminaire schedule. .3 Panel schedule may be in preliminary form but circuitry must be included. .4 Applicable installation details. .5 General legend and list of abbreviations. .6 Voltage drop computation for all main feeders. .7 Short circuit analysis .8 Provide 1/2" scale floor plan and wall elevations for all electrical rooms.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • OPERATIONAL CAPABILITY Contractor represents and warrants, as previously certified in Contractor’s Bidder’s Certification, that Contractor has the operational and financial capability to perform the Contract.