Common use of LOAD TICKETS Clause in Contracts

LOAD TICKETS. 3.1 While it is preferred that an e-ticket system will be utilized for monitoring, should a manual system be used, load tickets shall be used for recording the cubic yard volume of debris removed for disposal. In the event that an e-ticket system is not utilized, the following process will be used regarding load tickets. A copy of the load ticket to be used by the Contractor shall be submitted for City approval prior to beginning work. The Contractor shall provide all load tickets to the City. The load ticket numbers shall be sequentially numbered. The load tickets shall be a minimum of four-parts. A sample load ticket is included as an attachment. 3.2 The e-ticket system, or if manual tickets are used, shall contain the following information: • Ticket Number • Contract Number • Contractor Name • Date • Truck or Roll-off Number • Truck Capacity • Point of Debris Collection • Loading Departure Time • Dump Arrival Time • Percent of Load • Actual Debris Volume • Debris Eligibility (Y/N) • Type of Debris 3.3 In the event manual tickets are used, a minimum of four-part load ticket will be issued by a City monitor prior to transport of the debris from the loading site. The entire four-part load ticket is given to the vehicle operator. Upon arrival at the dumpsite, the vehicle operator will give the entire four-part load ticket to the City monitor. The City monitor will verify the hauler and equipment and establish a percent of truck capacity of the eligible cubic yardage of debris load. After documenting percentage to the nearest 5%, the City monitor will calculate the actual cubic yardage of the load. The actual cubic yard will be recorded on the load ticket by the City monitor to the nearest cubic yard. The City monitor will document the data on the load ticket. The City monitor will give one copy to the vehicle operator. One copy is then given to the Contractor. The original will be kept by the City and the fourth will be provided to any other entity that may need a copy. The load tickets shall be submitted with the daily operational report.

Appears in 2 contracts

Sources: Contract for Emergency Debris Removal and Disposal Services, Contract for Emergency Debris Removal and Disposal Services