Lintels Sample Clauses

Lintels. The soffit height is at 2100mm above FFL.
Lintels. The soffit height is at 2100mm above FFL. • Provision made for a 150mm wide and 50mm thick smooth plaster band around selected windows as per Architect`s drawings.
Lintels. 230x100mm; RC with four 12mm mild steel bars; 8mm stirrups at 150mm centres.  Blockwork: Cement sand blocks 4MPa to 100mm & 150mm partition walls. Roofing  Brushing & making clean the surface of all the rusted steel roof  Application of two coats of red lead primer  Installation of 28G colour coated IT5 aluminium sheets with all required accessories. Finishing  40mm one coat beds, screeded to receive porcelain tiles, to concrete or blockwork base to floor levels.  15mm one coat work; to concrete or blockwork base to walls and upstands to walls.  Three coats weather guard paint wood floated rendered surfaces to walls over 300mm girth internally and externally.  Grill works: Window grillies consisting of angle frame; 6x25mm thick decorative flat bars, ends welded, angles cut; mitred welded all welding ground to smooth for sizes: 1200 x 1800mm, 1800x1000mm, 1000x1200mm.  Grill door: Metal plate gate, comprising of 4mm thick sheet plate welded to 30 x30mm RSH hollow sections frames; 6x25mm thick Decoratives flat bars, welded & grinded to smooth finish; primed and painted 2 coats gloss finish, complete with its locking device to Architect’s approval. For: 4000x4000mm overall size; single swing GD1 and 3700 x 2100mm overall size; single swing, GD2 repair. Services and fittings  Plumbing, fitting and reinstallation works  Electrical fittings and reinstallation of the works Renovation of Metalworks and fabrication workshop Demolition  Carefully apply carbon fibre or other waterproofing materials to seal any leaking areas on the roof, ensuring a thorough repair and proper finishing.  Removing away debris; making good all disturbed surfaces.  400mm depth concrete beam; to make way for a new gate.  Scrapping off existing paint on walls.  Removal of existing floor finish and repair of defective patches approx. 260sqm.  Removal of windows and timber frame.  Careful removal of lighting objects, power objects, architraves, and all accessories.  Careful remove all the rust on steel trusses and purling & make clean.  Removal of timber board partition wall. Frames  Casting of columns supporting partition walls. 200x100mm, reinforced with 4nos. 12mm dia. Mild steel bars; 8mm stirrups  Casting of 230x100mm lintel beams  100mm thick partition wall.  100mm thick for partition Lab. Roof  Two coats of red lead primer; In-situ; two coats of approved oil paint on-site on the existing steel roof.  Installation of 28G resin colour-coated IT 5 aluminium sheet...