Lintels Sample Clauses
Lintels. The soffit height is at 2100mm above FFL.
Lintels. The soffit height is at 2100mm above FFL. • Provision made for a 150mm wide and 50mm thick smooth plaster band around selected windows as per Architect`s drawings.
Lintels. 230x100mm; RC with four 12mm mild steel bars; 8mm stirrups at 150mm centres. Blockwork: Cement sand blocks 4MPa to 100mm & 150mm partition walls. Roofing Brushing & making clean the surface of all the rusted steel roof Application of two coats of red lead primer Installation of 28G colour coated IT5 aluminium sheets with all required accessories. Finishing 40mm one coat beds, screeded to receive porcelain tiles, to concrete or blockwork base to floor levels. 15mm one coat work; to concrete or blockwork base to walls and upstands to walls. Three coats weather guard paint wood floated rendered surfaces to walls over 300mm girth internally and externally. Grill works: Window grillies consisting of angle frame; 6x25mm thick decorative flat bars, ends welded, angles cut; mitred welded all welding ground to smooth for sizes: 1200 x 1800mm, 1800x1000mm, 1000x1200mm. Grill door: Metal plate gate, comprising of 4mm thick sheet plate welded to 30 x30mm RSH hollow sections frames; 6x25mm thick Decoratives flat bars, welded & grinded to smooth finish; primed and painted 2 coats gloss finish, complete with its locking device to Architect’s approval. For: 4000x4000mm overall size; single swing GD1 and 3700 x 2100mm overall size; single swing, GD2 repair. Services and fittings Plumbing, fitting and reinstallation works Electrical fittings and reinstallation of the works Renovation of Metalworks and fabrication workshop Demolition Carefully apply carbon fibre or other waterproofing materials to seal any leaking areas on the roof, ensuring a thorough repair and proper finishing. Removing away debris; making good all disturbed surfaces. 400mm depth concrete beam; to make way for a new gate. Scrapping off existing paint on walls. Removal of existing floor finish and repair of defective patches approx. 260sqm. Removal of windows and timber frame. Careful removal of lighting objects, power objects, architraves, and all accessories. Careful remove all the rust on steel trusses and purling & make clean. Removal of timber board partition wall. Frames Casting of columns supporting partition walls. 200x100mm, reinforced with 4nos. 12mm dia. Mild steel bars; 8mm stirrups Casting of 230x100mm lintel beams 100mm thick partition wall. 100mm thick for partition Lab. Roof Two coats of red lead primer; In-situ; two coats of approved oil paint on-site on the existing steel roof. Installation of 28G resin colour-coated IT 5 aluminium sheet...
