Common use of Intervals for Major Infrastructure Modifications Clause in Contracts

Intervals for Major Infrastructure Modifications. Where No Forecast is Provided – An unforecasted Collocation Application may require CenturyLink to complete major infrastructure modifications to accommodate CLEC’s specific requirements. Major infrastructure modifications that may be required include conditioning space, permits, DC power plant, standby generators, heating, venting or air conditioning equipment. The installation intervals in Sections 8.4.2.4.3 through 8.4.2.4.4 may be extended, if required, to accommodate major infrastructure modifications. When major infrastructure modifications as described above are required, and if all of CLEC's equipment is available at the CenturyLink Premises no later than fifty-three (53) Days after receipt of the complete Collocation Application, CenturyLink shall propose to complete its installation of the Collocation arrangement within an interval of no more than one hundred and fifty (150) Days after receipt of the complete Collocation Application. The need for, and the duration of, an extended interval shall be provided to CLEC as a part of the quotation. CLEC may dispute the need for, and the duration of, an extended interval, in which case CenturyLink must request a waiver from the Commission to obtain an extended interval.

Appears in 4 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Intervals for Major Infrastructure Modifications. Where No Forecast is Provided – An unforecasted Collocation Application may require CenturyLink Qwest to complete major infrastructure modifications to accommodate CLEC’s specific requirements. Major infrastructure modifications that may be required include conditioning space, permits, DC power plantPower Plant, standby generatorsStandby Generators, heatingHeating, venting Venting or air conditioning equipmentAir Conditioning Equipment. The installation intervals in Sections 8.4.2.4.3 through 8.4.2.4.4 may be extended, if required, to accommodate major infrastructure modifications. When major infrastructure modifications as described above are required, and if all of CLEC's ’s equipment is available at the CenturyLink Qwest Premises no later than fifty-three sixty (5360)) Days calendar days after receipt of the complete Collocation Application, CenturyLink Qwest shall propose to complete its installation of the Collocation arrangement within an interval of no more than one hundred and fifty (150) Days calendar days after receipt of the complete Collocation Application. The need for, and the duration of, an extended interval shall be provided to CLEC as a part of the quotation. CLEC may dispute the need for, and the duration of, an extended interval, in which case CenturyLink Qwest must request a waiver from the Commission to obtain an extended interval.

Appears in 3 contracts

Samples: Agreement for Terms And, Agreement for Terms And, Agreement for Terms And

AutoNDA by SimpleDocs