Common use of Installation, Testing, Preliminary Acceptance Test, Trial Run And Final Acceptance Test Clause in Contracts

Installation, Testing, Preliminary Acceptance Test, Trial Run And Final Acceptance Test. 9.1 The Buyer, the End-user and the Seller/System Integrator will proceed with various tasks ranging from site survey, network planning/design, and equipment installation/optimization/test to acceptance in accordance with the Schedule of Project Progress set out Appendix 4. Within the term of this Service Contract, each of the Buyer, the End-user and the Seller/System Integrator should designate a representative in charge of dealing with technical issues in connection with this Service Contract, with their work plans to be determined through consultation among representatives of all parties. In the event that any technical problem is identified or a dispute on technical problem arises, representatives of the parties should analyze the reasons, clarify the responsibilities and coordinate to re-design. Day-to-day work and solutions shall be recorded in the work log during the design, commissioning and acceptance period. The daily record therein shall be confirmed by the respective representatives of the Parties by signature and each Party shall keep one copy. 9.2 The Seller/System Integrator shall be responsible for the network planning, design and optimization, Contracted Equipment installation and commissioning as well as commissioning for cutover of the System, while the technical personnel of the End-user shall provide necessary assistance. 9.3 The acceptance testing shall recognize the requirement for conformity to the indexes and standards as set forth in Appendix 1 of this Service Contract, as well as the test procedures and standards for acceptance set out in Appendix 6 of this Service Contract.

Appears in 1 contract

Sources: System Integration and Service Purchase Contract (Hurray! Holding Co., Ltd.)

Installation, Testing, Preliminary Acceptance Test, Trial Run And Final Acceptance Test. 9.1 The Buyer, the End-user and the Seller/System Integrator will proceed with various tasks ranging from site survey, network planning/design, and equipment installation/optimization/test to acceptance in accordance with the Schedule of Project Progress set out Appendix 4. Within the term of this Service Equipment Contract, each of the Buyer, the End-user and the Seller/System Integrator should designate a representative in charge of dealing with technical issues in connection with this Service Equipment Contract, with their work plans to be determined through consultation among representatives of all parties. In the event that any technical problem is identified or a dispute on technical problem arises, representatives of the parties should analyze the reasons, clarify the responsibilities and coordinate to re-design. Day-to-day work and solutions shall be recorded in the work log during the design, commissioning and acceptance period. The daily record therein shall be confirmed by the respective representatives of the Parties by signature and each Party shall keep one copy. 9.2 The Seller/System Integrator shall be responsible for the network planning, design and optimization, Contracted Equipment installation and commissioning as well as commissioning for cutover of the System, while the technical personnel of the End-user shall provide necessary assistance. 9.3 The acceptance testing shall recognize the requirement for conformity to the indexes and standards as set forth in Appendix 1 of this Service Equipment Contract, as well as the test procedures and standards for acceptance set out in Appendix 6 of this Service Equipment Contract.

Appears in 1 contract

Sources: System Equipment Purchase Contract (Hurray! Holding Co., Ltd.)