Information From Owner. The Owner shall provide the CM with information reasonably necessary to assist the CM in performing its services including, if applicable: 6.1.1 the Site legal description and any required survey; 6.1.2 all written and tangible material in its possession concerning conditions below ground at the Site; 6.1.3 if the Project involves an existing structure, all available as-built drawings, record drawings, plans, specifications and structure system information with respect to such structure; and 6.1.4 the Owner’s pertinent Project dates and key milestone dates.
Appears in 2 contracts
Sources: Contract Between Owner and Construction Manager, Contract Between Owner and Construction Manager