Information From Owner. The Owner shall provide the General Contractor with information reasonably necessary to assist the General Contractor in performing its services including, if applicable: (i) the Site legal description and any required survey; (ii) all written and tangible material in its possession concerning conditions below ground at the Site; (iii) if the Project involves an existing structure, all available as-built drawings, record drawings, plans, specifications and structure system information with respect to such structure; and (iv) the Owner’s pertinent Project dates and key milestone dates.
Appears in 2 contracts
Sources: Contract for Construction, Contract for Construction
Information From Owner. The Owner shall provide the General Contractor with information reasonably necessary to assist the General Contractor in performing its services including, if applicable:
(i) the Site legal description and any required survey;
(ii) all written and tangible material in its possession concerning conditions below ground at the Site;
(iii) if the Project involves an existing structure, all available as-built drawings, record drawings, plans, specifications and structure system information with respect to such structure; and
(iv) the Owner’s Owner‟s pertinent Project dates and key milestone dates.
Appears in 1 contract
Sources: Contract for Construction