Implementation Testing Sample Clauses

Implementation Testing. A substance test by pre-appointment as soon as feasible after the implementation of this Policy.
Implementation Testing. Implementation reviews are critical to ensuring the system was programmed to reflect the plan provisions and to ensure proper plan design administration and benefit adjudication.  Comparison of plan documents (e.g., SPDs, SBCs, etc.) to system mapping documents – independently validates the interpretation of Plan benefits referenced by system programmers, customer service representatives, and claims processors, benefit and implementation teams. Variances will be discussed with the carrier and/or the Plan to confirm the plan intent has been properly documented.  Adjudication Procedures Review - evaluates day-to-day procedures associated with claims adjudication. This review ensures proper controls and appropriate monitoring of processing activities are in place for accurate and timely benefit administration.  Scenario-Based Plan Design Testing – ▇▇▇▇▇ will review up to 75 claim scenarios. A scenario-based audit a comprehensive way to validate that the adjudication system is coded for proper administration of the plan design and benefit programs.

Related to Implementation Testing

  • Project Implementation The Borrower shall:

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards. 2. Grantee agrees to cooperate fully and provide the System Agency and its representatives timely access to Products, records, and other items and information needed to conduct such review, evaluation, testing, and monitoring.

  • Post-Commercial Operation Date Testing and Modifications Developer and Connecting Transmission Owner shall each at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice and Applicable Reliability Standards as may be necessary to ensure the continued interconnection of the Large Generating Facility with the New York State Transmission System in a safe and reliable manner. Developer and Connecting Transmission Owner shall each have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities (including required control technologies and protection systems) and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer’s Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.