Hydraulic Dredging Sample Clauses

Hydraulic Dredging. Hydraulic dredging operations shall be performed between Channel 1A Station 7+50 to 24+00; Channel 1B Station 24+00 to 33+20; Channel 2 A Station 0+00 to 8+32.71; Channel 2B Station 8+32.71 to 12+98.49; Channel 2C Station 12+98.49 to 16+00 including (Basin); Channel 2D Station 16+00 to 25+11.78; Channel 3A Station 0+00 to 7+50; and Channel 3B Station 7+50 to 17+83. All work shall be performed as specified herein and as shown on the contract drawings. To minimize potential of channel wall failures, the required dredging shall be performed in steps, with each face of dredging not to exceed a 5 foot thickness or exceed a three (3) to one (1) side slope along the channel wall.