Hydraulic Data. (a) Stage-area and stage-capacity curves of the reservoir, forebay and Regulating Basin, with contoured survey maps on which based. (b) Full Pondage Level, Dead Storage Level and Operating Pool together with the calculations for the Operating Pool. (c) Dead Storage capacity. (d) Estimated evaporation losses in the reservoir, Regulating Basin, head-race, forebay and tail-race. (e) Maximum designed flood discharge, discharge-capacity curve for spillway and maximum designed flood level. (f) Designated range of operation.
Appears in 1 contract
Sources: Indus Waters Treaty
Hydraulic Data. (a) Stage-area and stage-capacity curves of the reservoir, forebay and Regulating Basin, Basin with contoured survey maps on which based.
(b) Full Pondage Level, Dead Storage Level and Operating Pool together with the calculations for the Operating Pool.
(c) Dead Storage capacity.
(d) Estimated evaporation losses in the reservoir, Regulating Basin, head-race, forebay and tail-race.
(e) Maximum designed flood discharge, discharge-capacity curve for spillway and maximum designed flood level.
(f) . Designated range of operation.
Appears in 1 contract
Sources: Indus Waters Treaty