Common use of General Items Clause in Contracts

General Items. 1. All of the design and construction activities of Atmos and/or Interconnector described in this Agreement will be in accordance with “Material and Construction Specifications for Facilities Constructed by non-Atmos Contractors and Third Parties” which are incorporated herein by reference and are available to Interconnector, as they may change from time to time, on ATMOS’ Web Site at : by using Interconnector’s special assigned ID and Password set out in Exhibit “C,” which is incorporated herein by reference. In the event such specifications do not set forth details specific enough for Interconnector to carry out any of the design or construction activities described in this Agreement, Interconnector will obtain a written clarification or exception from the applicable division’s Atmos Technical Services Department before taking action. All ID’s and Passwords are valid for limited periods of time and ATMOS will provide a new ID and Password upon email request as provided in Exhibit “C.” 2. Due to the accelerated time schedule for the installation of the Measurement Facilities, Atmos and Interconnector both recognize that certain specified types of equipment may not be available during the initial installation of the Facilities. If a temporary substitution of equipment for the measuring station is desired by Interconnector during the initial construction of the Measurement Facilities, then Interconnector will notify the Atmos Technical Services Department of the nature of the temporary substitution and will obtain Atmos’ written permission for an approved substitution. As soon as practicable thereafter the Measurement Facilities’ in-service date, Interconnector will advise Atmos when the originally specified equipment is available and will coordinate activities with Atmos so that the temporary equipment may be removed and the originally specified equipment may be installed. All costs associated with the change-out of said equipment will be borne solely by Interconnector. Ownership of the temporary equipment will remain with the Party supplying such equipment. 3. Notwithstanding any provision of this Agreement, or any other agreement between the Parties, to the contrary, no compressor shall be physically located within 100 feet of the Measurement Facilities. Applicable pulsation attenuation devices will be required if the Measurement Facilities are connected, directly or indirectly, to a compressor by less than 1000 feet of pipe. Requirements for pulsation attenuation devices for direct or indirect connections of the Measurement Facilities to a compressor by more than 1000 feet of pipe will be evaluated by the applicable division’s Atmos Technical Services Department. Furthermore, in the event that vibration or noise originating from the Measurement Facilities, any upstream Interconnector’s equipment, or any third-party source results in measurement inaccuracy, or additional gas quality monitoring, or the range of control or measurement is insufficient for accurate control or measurement, then Interconnector agrees to remedy such issue to Atmos’ reasonable satisfaction at the sole cost and expense of the Interconnector. Notwithstanding anything herein to the contrary, no upstream or downstream facilities (including, but not limited to, compression, dehydration, separation, pigging, processing and/or treating) shall be located within 100 feet of the Measurement Facilities without the written consent of Atmos.

Appears in 1 contract

Sources: Interconnect Agreement

General Items. 1. All of the design and construction activities of Atmos and/or Interconnector described in this Agreement will be in accordance with “Material and Construction Specifications for Facilities Constructed by non-Atmos Contractors and Third Parties” which are incorporated herein by reference and are available to Interconnector, as they may change from time to time, on ATMOSAtmosWeb Site website at : by using Interconnector’s special assigned ID and Password set out in Exhibit “C,” which is incorporated herein by reference. ▇▇▇▇▇://▇▇▇.▇▇▇▇▇▇▇▇▇▇▇.▇▇▇/partners/pipeline-interconnects-and-gas-supply In the event such specifications do not set forth details specific enough for Interconnector to carry out any of the design or construction activities described in this Agreement, Interconnector will obtain a written clarification or exception from the applicable division’s Atmos Technical Services Department before taking action. All ID’s and Passwords are valid for limited periods of time and ATMOS will provide a new ID and Password upon email request as provided in Exhibit “C.” 2. Due to the accelerated time schedule for the installation of the Measurement Facilities, Atmos and Interconnector both recognize that certain specified types of equipment may not be available during the initial installation of the Facilities. If a temporary substitution of equipment for the measuring station is desired by Interconnector during the initial construction of the Measurement Facilities, then Interconnector will notify the Atmos Technical Services Department of the nature of the temporary substitution and will obtain Atmos’ written permission for an approved substitution. As soon as practicable thereafter the Measurement Facilities’ in-service date, Interconnector will advise Atmos when the originally specified equipment is available and will coordinate activities with Atmos so that the temporary equipment may be removed and the originally specified equipment may be installed. All costs associated with the change-out of said equipment will be borne solely by Interconnector. Ownership of the temporary equipment will remain with the Party supplying such equipment. 3. Notwithstanding any provision of this Agreement, or any other agreement between the Parties, to the contrary, no compressor shall be physically located within 100 feet of the Measurement Facilities. Applicable pulsation attenuation devices will be required if the Measurement Facilities are connected, directly or indirectly, to a compressor by less than 1000 feet of pipe. Requirements for pulsation attenuation devices for direct or indirect connections of the Measurement Facilities to a compressor by more than 1000 feet of pipe will be evaluated by the applicable division’s Atmos Technical Services Department. Furthermore, in the event that vibration or noise originating from the Measurement Facilities, any upstream Interconnector’s equipment, or any third-party source results in measurement inaccuracy, or additional gas quality monitoring, or the range of control or measurement is insufficient for accurate control or measurement, then Interconnector agrees to remedy such issue to Atmos’ reasonable satisfaction at the sole cost and expense of the Interconnector. Notwithstanding anything herein to the contrary, no upstream or downstream facilities (including, but not limited to, compression, dehydration, separation, pigging, processing and/or treating) shall be located within 100 feet of the Measurement Facilities without the written consent of Atmos.. OWNERSHIP AND OPERATION OF THE MEASUREMENT FACILITIES

Appears in 1 contract

Sources: Interconnect Agreement