Gas Procurement for GBP plant Sample Clauses

Gas Procurement for GBP plant i. Seller shall arrange gas on it’s own or through GAIL or in combination as per the declaration in the submitted bid. The calculated VCGA (as mentioned in Clause 2.2) shall also be applicable to Seller as per terms of this agreement if arrange gas for themselves. Seller shall contract for gas with 100% commitment basis to meet gas requirement for minimum guaranteed offtake generation under this agreement for supply during this period. No additional charges whatsoever shall be paid other than tariff mentioned in this agreement to seller towards arrangement of gas if seller arranges gas own it’s own or through any alternate arrangement.
AutoNDA by SimpleDocs

Related to Gas Procurement for GBP plant

  • CFR PART 200 Procurement of Recovered Materials A non-Federal entity that is a state agency or agency of a political subdivision of a state and its contractors must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines. Does vendor certify that it is in compliance with the Solid Waste Disposal Act as described above? Yes

  • Public Procurement 1. The Parties consider the liberalization of their respective public procurement markets as an objective of this Agreement.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Green Economy/Carbon Footprint a) The Supplier/Service Provider has in its bid provided Transnet with an understanding of the Supplier’s/Service Provider’s position with regard to issues such as waste disposal, recycling and energy conservation.

  • Other Methods of Procurement of Goods The following table specifies the methods of procurement, other than International Competitive Bidding, which may be used for goods. The Procurement Plan shall specify the circumstances under which such methods may be used: Procurement Method

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Particular Methods of Procurement of Goods Works and Services (other than Consultants’ Services)

  • Other Methods of Procurement of Consultants’ Services The following table specifies methods of procurement, other than Quality and Cost-based Selection, which may be used for consultants’ services. The Procurement Plan shall specify the circumstances under which such methods may be used. Procurement Method

  • CONSTRUCTION AND RELATED ENGINEERING SERVICES A. General construction work for buildings (CPC 512) 1) Unbound* 2) None 3) None 1) Unbound* 2) None 3) None

  • DISADVANTAGED BUSINESS ENTERPRISE OR HISTORICALLY UNDERUTILIZED BUSINESS REQUIREMENTS The Engineer agrees to comply with the requirements set forth in Attachment H, Disadvantaged Business Enterprise or Historically Underutilized Business Subcontracting Plan Requirements with an assigned goal or a zero goal, as determined by the State.

Time is Money Join Law Insider Premium to draft better contracts faster.