Common use of Functional Standards Clause in Contracts

Functional Standards. Customer-Generator shall furnish, install, operate and maintain in good order and repair, all without cost to Rocky Mountain Power, all equipment required for the safe operation of the Generating Facility in parallel with Rocky Mountain Power’s system. This equipment shall include, but not be limited to, equipment necessary to establish automatically and maintain synchronism with Rocky Mountain Power’s electric supply. Customer-Generator’s Generating Facility shall at all times comply with all applicable power quality standards, including, but not limited to, IEEE Standard 519- 1992 Harmonic Limits. The Generating Facility shall be designed to operate within allowable voltage variations of Rocky Mountain Power’s system. The Generating Facility shall not cause any adverse effects upon the quality of service provided to Rocky Mountain Power’s non-generating customers. Customer-Generator shall provide evidence that the Generating Facility will never result in reverse current flow through Rocky Mountain Power’s network protectors. The Generating Facility shall be designed to automatically disconnect from Rocky Mountain Power’s system in the event of overload or outage of Rocky Mountain Power’s supply, in compliance with NEC 445.10 and 705.40.

Appears in 1 contract

Sources: Interconnection Agreement for Net Metering Service

Functional Standards. Customer-Generator shall furnish, install, operate and maintain in good order and repair, all without cost to Rocky Mountain Power, all equipment required for the safe operation of the Generating Facility in parallel with Rocky Mountain Power’s system. This equipment shall include, but not be limited to, equipment necessary to establish automatically and maintain synchronism with Rocky Mountain Power’s electric supply. Customer-Generator’s Generating Facility shall at all times comply with all applicable power quality standards, including, but not limited to, IEEE Standard 519- 519-1992 Harmonic Limits. The Generating Facility shall be designed to operate within allowable voltage variations of Rocky Mountain Power’s system. The Generating Facility shall not cause any adverse effects upon the quality of service provided to Rocky Mountain Power’s non-non- generating customers. Customer-Generator shall provide evidence that the Generating Facility will never result in reverse current flow through Rocky Mountain Power’s network protectors. The Generating Facility shall be designed to automatically disconnect from Rocky Mountain Power’s system in the event of overload or outage of Rocky Mountain Power’s supply, in compliance with NEC 445.10 and 705.40.

Appears in 1 contract

Sources: Interconnection Agreement