Common use of Functional Standards Clause in Contracts

Functional Standards. Member/Owner shall furnish, install, operate and maintain in good order and repair, all without cost to BVEA, all equipment required for safe operation of the Facility in parallel with BVEA’s system. This equipment shall include, but not limited to equipment necessary to establish automatically and maintain synchronism with BVEA’s electric supply and a load break switching device that shall automatically disconnect the unit from BVEA’s supply in the even of overload or outage of BVEA’s supply. The Facility shall be designed to operate within allowable voltage variations of BVEA’s system. The Facility shall not cause any adverse effects upon the quality of service provided to other BVEA customers. Member/Owner’s Generating Facility shall at all times comply with all applicable power quality standards, including, but not limited to, IEEE Standard 519-1992 Harmonic Limits. The Generating Facility shall be designed to automatically disconnect from BVEA’s system in the event of overload or outage of BVEA’s supply, in compliance with NEC 445.10 and 705.40.

Appears in 2 contracts

Sources: Interconnection Agreement for Net Metering Service, Interconnection Agreement

Functional Standards. Member/Owner shall furnish, install, operate and maintain in good order and repair, all without cost to BVEA, all equipment required for safe operation of the Facility in parallel with BVEA’s system. This equipment shall include, but not be limited to to, equipment necessary to establish automatically and maintain synchronism with BVEA’s electric supply and a load break switching device that shall automatically disconnect the unit from BVEA’s supply in the even event of overload or outage of BVEA’s supply. The Facility shall be designed to operate within allowable voltage variations of BVEA’s system. The Facility shall not cause any adverse effects upon the quality of service provided to other BVEA customers. Member/Owner’s Generating Facility shall at all times time comply with all applicable power quality standards, including, but not limited to, IEEE Standard 519-1992 Harmonic Limits. The Generating Facility shall be designed to automatically disconnect from BVEA’s system in the event of overload or outage of BVEA’s supply, in compliance with NEC 445.10 and 705.40.

Appears in 1 contract

Sources: Interconnection Agreement for Net Metering Service