Final Design Phase Sample Clauses

Final Design Phase. A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall:
AutoNDA by SimpleDocs
Final Design Phase. If Engineer is to provide professional services with respect to the Project during the Final Design Phase, Engineer shall:
Final Design Phase. 3. Upon NBU’s approval of the PER and 30% design documents, the Professional shall perform the final design phase services described below.
Final Design Phase. During the Final Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:
Final Design Phase. (Service C)
Final Design Phase. A. Engineer shall:
AutoNDA by SimpleDocs
Final Design Phase. The design phase of the project shall consist of the preparation of completely approved construction documents that reflect the approved Preliminary Engineering Report recommendation accepted by Fort Bend County. The Design shall build upon the framework identified in the Preliminary Engineering Report and include roadway design, profiles, drainage system and appurtenances, details, and the bid documents necessary for a complete design review. The submittal shall be considered final and ready for construction, barring minor comments from Fort Bend County. The Design Submittal shall address all comments from the Preliminary Engineering Phase of the project. The Design Submittal shall include the submittal of the construction ready Plans on 11”x17”, Specifications, and a Cost Estimate (PS&E) in accordance with FBCED requirements. The design phase shall also include the coordination of utilities. The coordination shall include, but not limited to: • Depict utilities to a reasonable degree of accuracy on the plan and profile drawings. • Utility Conflict Table to be updated during the Final Design Phase as required. Refer to Appendix C, Fort Bend County Utility Conflict Table template. • Submit milestone level drawings to applicable utility companies for their review. • TxDOT coordination and permitting for the project at the intersection of FM 1093. The design submittal includes the following milestones: • 70% Submittal (1st Submittal):
Final Design Phase. During the final design phase, DESIGN/BUILDER shall:
Final Design Phase. After written acceptance by OWNER of the preliminary design phase documents DESIGN/BUILDER shall: