Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31, 2024.

Appears in 6 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31, 20242022.

Appears in 4 contracts

Sources: Construction Management Services Agreement, Construction Management Services Agreement, Construction Management Services Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31September 30, 20242022.

Appears in 4 contracts

Sources: Guaranteed Maximum Price Agreement, Construction Management Services Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31November 10, 20242025.

Appears in 3 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31November 3, 20242025.

Appears in 3 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31July 14, 20242023.

Appears in 3 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31September 30, 20242021.

Appears in 3 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31August 30, 20242022.

Appears in 3 contracts

Sources: Construction Management Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31August 30, 20242025.

Appears in 3 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31, 20242025.

Appears in 3 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31December 30, 2024.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Design Build shall be achieved by October 31April 24, 20242023.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31August 9, 2024.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31April 4, 2024.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31by: Phase I – September 30, 2023 and Phase II – September 30, 2024.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Construction Management Services Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31August 11, 20242025.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31November 6, 20242023.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 3130, 20242022.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31November 29, 20242023.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31November 2, 20242018.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31September 5, 20242025.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31July 20, 20242022.

Appears in 2 contracts

Sources: Construction Management Services Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31, 20242018.

Appears in 2 contracts

Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 311, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31July 15, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31February 24, 20242022.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31February 29, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Design Build shall be achieved by October 31April 28, 20242026.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31September 16, 20242022.

Appears in 1 contract

Sources: Construction Management Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31September 30, 20242020.

Appears in 1 contract

Sources: Construction Management Services Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 3121, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 3130, 20242021.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31November 21, 20242021.

Appears in 1 contract

Sources: Construction Management Services Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31February 24, 20242026.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31September 29, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 3115, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31August 11, 20242026.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31May 26, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31February 28, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31September 30, 20242019.

Appears in 1 contract

Sources: Construction Management Services Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31May 22, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31December 22, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31March 27, 20242026.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31November 4, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 3110, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 3111, 20242022.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31February 5, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31February 10, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31February 3, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Design Build shall be achieved by October 31November 17, 20242022.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31September 2, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Design Build Services shall be achieved by October 31December 22, 20242019.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 3130, 20242022.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31December 24, 20242017.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 313, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31September 13, 20242020.

Appears in 1 contract

Sources: Construction Management Services Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31August 30, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31May 2, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31December 1, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31August 1, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31August 14, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Design Build Services shall be achieved by October 31September 9, 20242021.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31April 21, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October August 31, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31December 30, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31July 22, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October December 31, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31September 14, 20242022.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October January 31, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Design Build Services shall be achieved by October 311, 20242019.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October August 31, 20242022.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Design Build Services shall be achieved by October 31September 30, 20242019.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31April 3, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31December 20, 20242022.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31April 2, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31March 9, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31June 30, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31September 10, 20242021.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31September 1, 20242017.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31March 10, 20242022.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31April 30, 20242022.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 3117, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Design Build shall be achieved by October March 31, 20242025.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31April 29, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31March 20, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31April 12, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31November 2, 20242017.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31November 29, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 3128, 20242022.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October March 31, 20242018.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31September 30, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31July 2, 2024.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31April 26, 20242023.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31February 27, 20242026.

Appears in 1 contract

Sources: Guaranteed Maximum Price Agreement

Final Completion Date. Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by October 31March 30, 20242021.

Appears in 1 contract

Sources: Construction Management Services Agreement