Fieldwork. The City shall conduct archaeological fieldwork as presented in the AIS Plan. For construction Phases 1, 2 and 3, the archaeological fieldwork shall be completed in advance of the completion of final design for each phase so that the presence of any sensitive archaeological sites/burials discovered during fieldwork may be considered during final design and measures incorporated to avoid and/or minimize adverse effects on historic properties. The City shall inform OIBC of status of the archaeological investigation. Fieldwork required by the AIS Plan shall include, but not be limited to, the following: 1. Reconnaissance survey (archival research and visual inspection by pedestrian inventory) within the APE, 2. A sample survey of subsurface conditions with ground- penetrating radar (GPR), and subsurface inspection as warranted, 3. A subsurface testing regime for locations identified in the AIS Plan, 4. A description of archaeological methods specific and applicable to the findings will be used in analysis, and 5. Draft and final reports summarizing the results of the fieldwork and analysis shall be submitted to the SHPD for review and approval.
Appears in 2 contracts
Sources: Programmatic Agreement, Programmatic Agreement