External facades Sample Clauses

External facades. The original face brickwork, sandstone, vents, and joinery components of all facades of Nos ▇▇ ▇▇ ▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇ must be retained and conserved, except where new openings are approved as part of this consent. The following modifications must be undertaken and submitted for approval: (i) The paintwork must be removed from the facades of Nos ▇▇ ▇▇ ▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇ to expose the original face brickwork, stonework and vents. These requirements apply to the following facades: a. Lower Ground level, the Ground Floor level, Level 1, Level 2 and the parapet level of the ▇▇▇▇▇ Street, Crown Street, and ▇▇▇▇▇▇ Street facades and the facades of the splayed corners at the intersection of both Crown Street and ▇▇▇▇▇▇ Street with ▇▇▇▇▇ Street. b. Extending above the street awning to include Level 1, Level 2 and the parapet level of the Oxford Street facade, as well as the facades of the splayed corners at the intersection of both Crown Street and ▇▇▇▇▇▇ Street with Oxford Street. c. Where paintwork has been applied to the transoms and glazing of the shopfronts or to the structural glazing of the piers either side of the shopfronts. (ii) The brickwork pier to be retained on the ▇▇▇▇▇ Street facade between Nos 100 and ▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇ centred on gridline 12 must be increased in length. The piers must be equivalent in depth to the remainder of the facade and must be a minimum length of 480mm (as measured along the facade), centred on gridline 12. (iii) A brickwork pier of a minimum length of 240mm (as measured along the facade), must be retained between Nos. ▇▇ ▇▇▇ ▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇▇ on gridline 5, incorporated into the substation facade. (iv) Lead or zinc cappings must be applied to the top surfaces of all the brick parapets to protect the facades from ingress of water. The modifications must be submitted to and approved by Council’s Area Planning Manager prior to the issue of a Stage 1 Construction Certificate.