EXTERNAL ENVELOPE Clause Samples
EXTERNAL ENVELOPE. Omission of personnel door to loading bay. Relocation of loading bay door. Double doors to inflammable liquids store. Double doors to garden equipment store. Relocation of door to Engineering Department. Relocation of door on grid line 1 between machine maintenance and dry manufacturing. Independent inflammable liquids store. Louvres required for fresh air intake to a/c plant and compressors, and inflammable liquids store.
EXTERNAL ENVELOPE. 3.1 Elevations The elevations consist of brick piers, granite plinths, slate bends and aluminium windows and cladding. The elevations are designed to minimise the use of vertical movement joints. The composite construction of the external walls provides a "U" value of 0.35 watts per square metre overall. Various decorative elements of metalwork are attached to the brickwork and cladding.
EXTERNAL ENVELOPE. ⮚ Inspect the integrity of the timber roof structure to ensure that it is woodborer free, carry out any required work identified in the inspection, and provide a Certificate of Compliance once completed ⮚ Clean out and disinfect bird infestation in roof space by specialist ⮚ Service existing roof sheeting including checking and re-fixing where necessary to ensure a watertight installation ⮚ Remove all existing timber facia boards as well as existing rainwater goods and replace with fibre cement facia boards, 140 x 150mm seamless aluminium gutters and PVC down pipes. Install narrow flute closers to underside of roof sheets and purpose made closers at ridge to prevent bird ingress ⮚ Existing brick chimney to be extended by 500mm and construction new caping with a precast concrete slab/ concrete lintols including finishing with plater/ screed to falls ⮚ Sand down and paint timber doors and door frames ⮚ Sand down, repair as required all extensive rust, and paint all steel window frames and burglar bars as indicated in Window Schedule. Replace damaged or missing ironmongery ⮚ Prepare all existing painted walls for new paint, including repairing cracks in plaster, and apply new paint ⮚ Prepare ▇▇▇▇▇ lining for new paint and apply new paint ⮚ Install new steel balustrade to edge of walkway at back of building at office entrance. ⮚ Electrical: Inspect all electrical wiring, carry out necessary repair work and issue Certificate of Compliance. Remove all existing light switches, switched socket outlets (excluding switch sockets in power skirtings) and light fittings and replace with new. ⮚ Prepare and apply new paint to existing plastered walls, timber doors and steel door frames, as well as existing plasterboard ceilings ⮚ Service all existing internal timber doors to ensure proper functioning as well as replacing ironmongery as might be required ⮚ Remove steel curtain rails and replace with timber pole curtain rails and fixing brackets ⮚ Remove existing binds and replace with new ⮚ Install insulating material in roof space between trusses
EXTERNAL ENVELOPE. Masonry Units to external walls 4.2 Plaster internally and externally.