EQUIPMENTS Sample Clauses
POPULAR SAMPLE Copied 2 times
EQUIPMENTS. 13.1 BSNL will test the equipment prior to activation & customer shall ensure its functionalities thereafter BSNL shall not be responsible for any of the defect / fault etc. which is not expressly covered by the manufacture warranty of the equipment. Any repairs / exchange carried out by BSNL at the request of customer for defects etc. shall be charged from the customer as per BSNL policy on the subject from time to time.
EQUIPMENTS. The Developers shall install equipments in the floor/building as per specifications annexed hereto as Annexure-V The Electronic equipment installed in the floor shall bear warranty from the date of installation and the developers shall hand over the warranty card of these equipments to the purchaser at the time of handing over possession of the floor.
EQUIPMENTS. All the equipment of DINAMA’s Laboratory is stated in the corresponding inventory located in the file Equipment Maintenance and Control. To guarantee the appropriate operation of the equipment, there are user guides of the equipment for those that thus require it, depending on the difficulty of the operation. The guides are located next to the equipment. The existing guides are stated in the “List of Valid Documents”. We have an Equipment Maintenance and Control programme that guarantees the status of operation, inspection and preventive maintenance of all equipment related to analytical determinations, which is included in the aforementioned folder. The programme is annually revised and it states the frequency of preventive maintenance and of operation controls, provides guidance on how to carry them out and identifies the people responsible for its execution. The Person responsible for Quality, together with the one responsible for maintenance, establishes the schedule depending on the use frequency, the stability of the equipment and the accuracy of the operation variables required for the analytical determinations. This programme is approved by the Head of the Laboratory. The equipment used for the routine analyses are listed in the Equipment Maintenance and control folder, where there is a record stating: • The equipment specifications. • The instructions of the preventive maintenance to be carried out. • The controls of the operation variables or their calibration. Together with the record there are the preventive and corrective maintenance records, as well as the records of the operation controls and calibrations, if appropriate. The Laboratory has hired a company that provides permanent service of preventive and corrective maintenance for most of the equipments, except for those that have an exclusive representative firm in the country which are derived to the supplier’s technical service. If the control of the operational variables do not match the specifications stated for each equipment, it is notified to the person responsible for maintenance. It is the responsibility of Quality to carry out the Control and Maintenance programme of the equipment.
EQUIPMENTS. The Distributor shall, at the request of the DTH Service Provider supply or cause to be supplied the Equipment to the DTH Service Provider that will enable the DTH Service Provider to down link the Subscribed Channel(s) at the Up linking Facility from the Distributor Satellite transponder
EQUIPMENTS. The Employer shall not require employees to take out on the street or highways any vehicle that is not in safe operating condi- tion or equipped with safety appliances prescribed by law. It shall not be a violation of this Agreement where employees refuse to operate such equipment unless such refusal is unjustified.
EQUIPMENTS. The Contractor shall provide tentative and minimal required list of equipment which are to be deployed at construction site. Sr. No. Equipment type and characteristics Minimum number required Equipment Minimum Capacity Max. Age (Years) The Contractor shall according to the Work Plan, determine the required number of equipment to be deployed at site. The Contractor shall submit the deployment plan for mobilization of equipment and the same shall be approved by the Engineer In Charge. The Contractor shall ensure, the equipment to be deployed at site for execution of works, shall be of the capacity to meet the Overall Schedule of completion of Works. The equipment to be deployed by the Contractor must abide with the below mentioned criteria:
(a) The Contractor shall verify latest position in respect of “Duties on Contractor’s Equipment” from Department of Revenue, Ministry of Finance, Government of India
(b) The Contractor shall list out and deploy the equipment which are not older than 5 years of age.
(c) Keeping in view the quantity of dredging, the Contractor shall deploy
