Equipment and Testing Sample Clauses

Equipment and Testing. Winstar shall be responsible for providing, at its sole expense, the antenna (e), coaxial cable, brackets, connectors, support structure, grounding and bonding materials, and weather-proofing materials for such support structure or antenna (e) required for the Microwave Collocation. Winstar shall also be solely responsible for final adjustments (e.g., pointing) of the antenna (e).
AutoNDA by SimpleDocs
Equipment and Testing. BellSouth will designate the location of and install the GPS antenna mounting bracket requested by BSLD on the exterior wall of a BellSouth Central Office, including the penetration through the exterior wall(s). BellSouth will also designate the specific cable support structure that BSLD must use to place its cabling that is required to connect BSLD’s GPS antenna to BSLD’s associated GPS equipment. BellSouth will provide an exit to the exterior wall of the BellSouth Central Office upon which the GPS antenna mounting bracket has been installed, so BSLD will have access to its GPS antenna. BSLD shall be responsible for providing, at its sole expense, the GPS antenna, coaxial cable, connectors, grounding and bonding materials, weather- proofing materials, and any other required equipment associated with the placement and maintenance of BSLD’s GPS antenna, BSLD’s GPS antenna shall be used solely for synchronization and timing purposes and will be connected to BSLD’s associated GPS equipment in the same BellSouth Central Office. BSLD shall be solely responsible for verifying that its GPS antenna can receive a satisfactory signal prior to BellSouth’s designation of the location of the antenna mounting bracket and for performing any final adjustments (e.g., positioning) to its GPS antenna and any associated equipment in BSLD’s physical collocation space.
Equipment and Testing. Teligent shall be responsible for providing, at its sole expense, the antenna (e), coaxial cable, brackets, connectors, support structure, grounding and bonding materials, and weather-proofing materials for such support structure or antenna (e) required for the Microwave Collocation. Teligent shall also be solely responsible for final adjustments (e.g., pointing) of the antenna (e).
Equipment and Testing. Fuzion shall be responsible for providing, at its sole expense, the antenna (e), coaxial cable, brackets, connectors, support structure, grounding and bonding materials, and weather-proofing materials for such support structure or antenna (e) required for the Microwave Collocation. Fuzion shall also be solely responsible for final adjustments (e.g., pointing) of the antenna (e).
Equipment and Testing. Pac-West shall be responsible for providing, at its sole expense, the antenna(e), coaxial cable, brackets, connectors, support structure and weather-proofing materials for such support structure or antenna(e) required for the Microwave Physical Collocation. Pac- West shall also be solely responsible for final adjustments (e.g., pointing) of the antenna(e). ----

Related to Equipment and Testing

  • EQUIPMENT AND TOOLS 40.01 The Employer will make available all necessary tools and equipment it requires for the performance of work assignments at no cost to the employees. Such tools and equipment will remain the property of the Employer and the employees will be required to take reasonable care of this property and may be required to sign out certain equipment and tools.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Inspection and Tests 3.8.1 The Procuring entity or its representative shall have the right to inspect and/or to test the goods to confirm their conformity to the Contract specifications. The Procuring entity shall notify the tenderer in writing in a timely manner, of the identity of any representatives retained for these purposes.

  • Equipment and Software To use the Mobile Remote Deposit Services, you must obtain and maintain at your expense, compatible equipment and software that we may specify from time to time.

  • Equipment and Materials Contractor at its sole cost and expense shall provide and furnish all tools, labor, materials, equipment, transportation services and any other items (collectively, "Equipment") which are required or necessary to perform the Services in a manner which is consistent with generally accepted standards of the profession for similar services. Notwithstanding the foregoing, District shall not be responsible for any damages to persons or property as a result of the use, misuse or failure of any Equipment used by Contractor of the Contracted Parties, even if such Equipment is furnished, rented or loaned to Contractor or the Contracted Parties by District. Furthermore, any Equipment or workmanship that does not conform to the regulations of this Agreement may be rejected by District and in such case must be promptly remedied or replaced by Contractor at no additional cost to District and subject to District’s reasonable satisfaction.

  • Inspections and Tests 26.1 The Supplier shall at its own expense and at no cost to the Procuring Entity carry out all such tests and/or inspections of the Goods and Related Services as are specified in the SCC.

  • Equipment and Facilities For On-Site Courses, you will supply the facility and equipment as set forth at xxx.xxxxxx.xxx/xxxxxxxx/xxxxxxxxx/xxxxxxxxxxxx.xxxx. If Red Hat agrees to provide the training facilities and hardware, you will be liable for any loss or destruction of this equipment and hardware used in connection with the Training.

  • Audit and Testing 4.1 The Contractor shall conduct tests of the processes and countermeasures contained in the Security Plan ("Security Tests") on an annual basis or as otherwise agreed by the Parties. The date, timing, content and conduct of such Security Tests shall be agreed in advance with the Authority.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner.

  • Repair Testing At the time of repair of a LIS trunk group, at no additional charge, tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

Time is Money Join Law Insider Premium to draft better contracts faster.