Common use of Electrical Clause in Contracts

Electrical. Provider assumes there is no additional customer-side protection or disconnects required by the District or utilities above that provided by the certified inverters. Provider assumes electrical equipment such as the inverter and AC utility Lockable Disconnect will be installed on the ground with a standard SunPower service concrete pad, located in close proximity to the System support structures and within a maximum number of feet of the proposed electrical tie-in location as shown on the proposed array layouts. Provider also assumes use of trenching consisting of open trenches, 18 to 24 inches wide and 2 to 4 feet deep, without issues related to underground utilities, and use of EMT conduit with rain-tight compression fittings for above ground installations, exclusive of surveillance camera conduit on structure which shall be rigid, and schedule 40 PVC conduits for below ground installations. Provider shall install lightweight (200 psi) concrete slurry as required by code at all underground duct banks, exclusive of any low voltage duct banks. Provider assumes all utility-owned electrical equipment serving the campuses have adequate capacity to handle the System output. Agreement assumes use of cellular modem for communication with a third party monitoring company. All other communication and low voltage infrastructure is excluded from this Agreement. Energy Management System Integration or similar control or SCADA system integrations to the System is excluded from this Agreement.

Appears in 16 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.