Electrical Output. 3.1.1 The Generator shall sell and deliver to the Offtaker the Contracted Electrical Output and the Offtaker shall purchase and accept the Contracted Electrical Output from the Generator, in each case in accordance with the provisions of this Agreement.
3.1.2 The Contracted Electrical Output to be sold by the Generator to the Offtaker under this Agreement shall be delivered at the Delivery Point.
3.1.3 The Generator shall sell the Contracted Electrical Output with full title guarantee, free from all charges, liens, other encumbrances and third party claims.
3.1.4 Property, title and risk in the Contracted Electrical Output shall pass to the Offtaker upon delivery to the Delivery Point.
Electrical Output. Subcontractor shall provide the income-eligible property owner or tenant with:
2.1 100 percent of the PV System’s electrical output as specified in each work order, at no- cost;
2.2 Any credits on the property owner’s or tenant’s electric bill that materializes from generating excess electrical output; and
2.3 A minimum performance guarantee level of 90 percent of the Weather-Adjusted expected output, on an annual per-home true-up schedule as specified in the “Performance Guarantee” section below. Subcontractor shall provide the above benefits for a minimum of 20 years from the date Subcontractor receives the PTO for the PV System from PEPCO.
Electrical Output. 2.1.1 The "Electrical Output" of the Facility shall be as specified in this Agreement adjusted, based on manufacturer and Contractor supplied correction curves.
2.1.2 Net Electrical Output" is the sum of the power produced by the CTGs and the STG, less the auxiliary loads to run plant equipment and electrical losses in GSU transformers, interconnecting transmission lines, auxiliary transformers and other distribution facilities.
2.1.3 For determination of Electrical Output, the Net Electrical Output of the plant shall be measured at either of the following locations at Contractor's option:
1. At the electric power revenue metering equipment which the Owner shall provide at the high side of the main step-up transformers, Owner shall be responsible for calibration of the power revenue metering equipment and shall provide Contractor with calibration data sheets prior to testing.
2. At the high side of each of the main step-up transformers, located on the plant site, with corrections forward to the utility interface using calculated transmission losses
Electrical Output. Subcontractor shall provide the income-eligible property owner(s) or tenant(s) with:
3.1 100 percent of the PV System’s electrical output as specified in Attachment C, at no- cost. If the DCSEU approves a Project(s) over 5 kW in Attachment C, Subcontractor must provide 100 percent of the electrical output from the Project(s) regardless of the level of DCSEU incentive;
3.2 Any credits on the property owner’s or tenant’s electric bill that materializes from generating excess electrical output; and
3.3 A minimum performance guarantee level of 90 percent of the Weather-Adjusted expected output on an annual per-home schedule as specified in the “Performance Guarantee” section below. Subcontractor shall provide the above benefits to the income-eligible property owner(s) or tenant(s) for a minimum of 20 years from the Commercial Operation Date.