The Earthing Protection clause establishes requirements for the proper grounding of electrical systems to ensure safety and prevent electrical hazards. It typically mandates that all electrical installations are equipped with adequate earthing systems, such as grounding rods or conductors, and that these systems are regularly inspected and maintained. By specifying these standards, the clause helps to minimize the risk of electric shock, equipment damage, and fire, thereby protecting both personnel and property.
Earthing Protection. Each array structure of the PV yard should be grounded/ earthed properly as per IS: 3043- ▇▇▇▇.▇▇ addition the lighting arrester/masts should also be earthed inside the array field. Earth Resistance shall be tested in presence of the representative of Department and when required after earthing by calibrated earth tester. PCU, ACDB and DCDB should also be earthed properly. Earth resistance shall not be more than 5 ohms. It shall be ensured that all the earthing points are bonded together to make them at the same potential.
Earthing Protection. Each array structure of the PV yard shall be grounded properly. In each array every module should be connected to each other with copper wires, lug teethed washers addition the lightening arrestor/masts shall also be provided inside the array field. Provision shall be kept for shorting and grounding of the PV array at the time of maintenance work. All metal casing/shielding of the plant shall be thoroughly grounded in accordance with Indian Electricity Act/IE rules as amended up to date. The earthing pit shall be made as per IS: 3043. All the array structures and equipments/control systems shall be compulsorily connected to the earth, separately. Number of earthling shall vary with the capacity of SPV Power Plant & location. G.I. /Copper strips should be used for earthling instead of G.I. wires. LA should be installed to protect the array field & machines installed in the control rooms. Number of LA shall vary with the capacity of SPV Power Plant & location. Earth resistance shall not be more than 5 ohms.
Earthing Protection i. The earthing shall be done in accordance with latest Standards. ii. Each array structure of the PV yard, Low Tension (LT) power system, earthing grid for switchyard, all electrical equipment, inverter, all junction boxes, etc. shall be grounded properly as per IS 3043- 2018. iii. All metal casing/ shielding of the plant shall be thoroughly grounded in accordance with CEA Safety Regulation 2010. In addition, the lightning arrester/masts should also be earthed inside the array field. iv. Earth resistance should be as low as possible and shall never be higher than 5 ohms. v. For 10 KW and above systems, separate three earth pits shall be provided for individual three earthings viz.: DC side earthing, AC side Earthing and Lightningarrestor earthing.

Related to Earthing Protection

  • ▇▇▇▇ Protection 1With respect to the Parties' rights and obligations under this Framework Agreement, the Parties agree that the Authority is the Data Controller and that the Supplier is the Data Processor.

  • Eye Protection Where an employee is required by the College or by legislation, in order to perform his/her duties, to acquire and wear prescription eye protection, the employee shall provide the College with proof of purchase by March 1 each year and the College shall reimburse to such employee, on the first pay day of April in each year, up to a maximum of twenty dollars ($20.00); in situations other than the foregoing, the College, may in its discretion, (which discretion shall not be unreasonably exercised) reimburse such expense where it is recommended by the health and safety committee constituted under the Occupational Health and Safety Act.

  • Fire Protection Contractor shall take adequate and reasonable precautions to protect the Work against damage by fire and smoke. For example, without limitation, Contractor shall do the following:

  • Job Protection 15.9.1 Subject to 15.10 below, an employee returning from parental leave is entitled to resume work in the same position or a similar position to the one they occupied at the time of commencing parental leave. A similar position means a position: (a) At the equivalent salary, grading; (b) At the equivalent weekly hours of duty; (c) In the same location or other location within reasonable commuting distance; and (d) Involving responsibilities broadly comparable to those experienced in the previous position. 15.9.2 Where applicable, employees shall continue to be awarded increments when their incremental date falls during absence on parental leave.

  • System Protection To prevent compromise of systems which contain DSHS Data or through which that Data passes: a. Systems containing DSHS Data must have all security patches or hotfixes applied within 3 months of being made available. b. The Contractor will have a method of ensuring that the requisite patches and hotfixes have been applied within the required timeframes. c. Systems containing DSHS Data shall have an Anti-Malware application, if available, installed. d. Anti-Malware software shall be kept up to date. The product, its anti-virus engine, and any malware database the system uses, will be no more than one update behind current.