Dust. The Contractor shall take all reasonable measures to minimize the generation of dust as a result of construction activities to the satisfaction of the PM Regular dust control measures in the form of dust suppression with water spraying shall be conducted by the Contractor. Where possible, soil stockpiles shall be located in sheltered areas where they are not exposed to the erosive effects of the wind.