Drum-making Clause Samples

Drum-making. ▇▇▇▇▇▇ ▇▇▇▇ prepared hides for the students to assemble their personal drums. He taught them about the teachings of the drum, since long ago only certain people could make a drum they had to know the values and songs associated with the tradition. The importance of self- respect and how you feel was highlighted as the emotions are transferred to the drum. This connected the emotional, physical, spiritual and mental aspects of the individual students, teaching them to know “who they are” when they create an important item such as a drum in the Coast Salish Tradition. A connection to a family of emerging drummers was anticipated however the father/son team was unavailable for this follow-up task.

Related to Drum-making

  • Load Shedding The Distributor may carry out Load Shedding in the following circumstances: (a) Maintenance of Network equipment: if the Distributor wishes to inspect or effect alterations, maintenance, repairs, or additions to any part of the Network, subject to clauses 4.6, 4.8, 4.10, and Schedule 5 as applicable; (b) Permitted by Service Standards: as permitted by the Service Standards, if the Customer has elected to receive an interruptible or otherwise non-continuous supply of electricity; (c) Compliance with instructions from the System Operator: (i) to comply with a request or instruction received from the System Operator in accordance with the Code; or (ii) if communication with the System Operator has been lost, and the Distributor reasonably believes that, had communication with the System Operator been maintained, the Distributor would have received a request or instruction from the System Operator to shed load in accordance with the Code; (d) Maintain security and safety: to maintain the security and safety of the Network in order to: (i) maintain a safe environment, consistent with the Distributor's health and safety policies; (ii) prevent unexpected short term overloading of the Network; (iii) prevent voltage levels rising or falling outside of legal requirements; (iv) manage System Security; and (v) avoid or mitigate damage to the Network or any equipment connected to the Network; (e) Compliance with the Code: to comply with the Code or the law; or (f) Other circumstances: for any other purpose that, in the Distributor’s reasonable opinion, and in accordance with Good Electricity Industry Practice, requires the interruption or reduction of delivery of electricity to any ICP.

  • ADJACENT EXCAVATION-SHORING If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.

  • No Process or Design Changes Supplier shall not make any process or design changes affecting Products or Services without DXC’s prior written consent.