DRAINAGE CONTROL. The Contractor shall maintain drainage within and through the work areas. Earth dams will not be permitted in paved areas. Temporary dams of native material, sandbags, or other acceptable material will be permitted when necessary. Such dams shall be removed from the site as soon as their use is no longer necessary.
Appears in 1 contract
Sources: Contract
DRAINAGE CONTROL. The Contractor shall maintain drainage within and through the work areas. Earth dams will not be permitted in paved areas. Temporary dams of native materialsandbags, sandbagsasphaltic concrete, or other acceptable material will be permitted when necessary. Such dams shall be removed from the site as soon as their use is no longer necessary.. ADD:
Appears in 1 contract
Sources: Construction Contract