Common use of Development and Production Clause in Contracts

Development and Production. 5.1 If the Contractor in its report under Article 4.6.5 considers that a Discovery is a Commercial Discovery, it shall submit to the Minister, within six (6) months following the date of submission of said report, an application for an Exploitation Licence accompanied by a detailed Development and Production Plan for the Field relating to said Discovery, specifying inter alia: (i) the planned delimitation of the Exploitation Area applied for by the Contractor, so that it covers the area defined by the seismic closure(s) of the Field concerned, together with all the technical justifications with respect to the extent of said Field; (ii) an estimate of the Crude Oil and/or Natural Gas reserves, their classification as proved, probable and possible according to international reserve classification practices, together with a study on the methods of recovery; (iii) the projected maximum economic efficient rate of production (MER) and expected annual production levels for Crude Oil and/or Natural Gas; (iv) the projected valuation of Crude Oil and Natural Gas to be produced; (v) the proposed Delivery Point(s) for Crude Oil and/or Natural Gas; (vi) the procedures for measuring production of Hydrocarbons at the Delivery Point(s); (vii) item by item description of the facilities, equipment and work necessary for production, such as the number of development ▇▇▇▇▇, the number of platforms, pipelines, production, processing, storage and loading facilities together with their specifications; (viii) as applicable, a marketing plan for Natural Gas, which may include the Contractor’s proposal to structure the project as an integrated or segmented gas project (including gathering, treating, and conditioning of Natural Gas for sale), accompanied by letters of intent from potential purchasers or other documents supporting the existence of a commercially viable market, including certainty of offtake; (ix) an estimated schedule for plan implementation and the projected date of production start-up; (x) estimates of all capital expenditures and operating costs, including necessary infrastructure; (xi) an environmental impact assessment study and an environmental impact management plan prepared in accordance with Applicable Environmental Legislation and Good International Petroleum Industry Environmental Practice; (xii) a provisional Decommissioning Plan, including an estimate of the Decommissioning Costs; and (xiii) as applicable, a study on the location, design, and costing of any pipeline facilities required for the transportation of Natural Gas beyond the Delivery Point to the point of export or use, together with possible financing options. 5.2 The Development and Production Plan submitted by the Contractor shall be subject to the approval of the Council of Ministers, which approval shall not be unreasonably withheld. Within ninety (90) days after the submission of said plan, the Minister, in consultation with other competent authorities of the Republic, may propose revisions or modifications to the Contractor’s initially proposed plan by notifying the Contractor of the substance of, and its justification for, the proposed revision(s) or modification(s). In that event, the Minister and the Contractor shall meet as soon as possible in order to consider the proposed revisions or modifications in light of Good International Petroleum Industry Practice. Promptly after the aforesaid meeting, the Contractor shall submit to the Minister a second proposed plan including any mutually agreed revisions or modifications. The Minister shall notify the Contractor of the Council of Ministers’ approval or disapproval of the second proposed plan within sixty (60) days of the date of submission of said plan. 5.3 The Contractor may not begin construction under a Development and Production Plan approved or deemed approved by the Council of Ministers until it has received all approvals required under Applicable Environmental Legislation, which approvals shall not be unreasonably withheld or delayed. 5.4 Upon a showing of reasonable technical justification for delay and a showing that the delay could not reasonably have been avoided by the Contractor in the exercise of reasonable diligence, the Contractor may request and shall receive an extension of up to twelve (12) months in the date for delivery of its proposed Development and Production Plan under Article 5.1. If the Contractor fails to deliver its proposed Development and Production Plan within the time required under this Article 5, taking into account any extension granted under this Article 5.4, the Minister may require by notice to the Contractor that unless the Contractor has delivered its proposed Development and Production Plan within thirty (30) days after the date the Contractor receives such notice, the Contractor will be deemed to have surrendered all its rights in respect of the Appraisal Area without any compensation for the Contractor, and the Contractor will forfeit all its rights on Hydrocarbons which could be produced from said discovery. 5.5 Within thirty (30) days from the date of approval or deemed approval of a Development and Production Plan, the Council of Ministers shall grant to the Contractor an Exploitation Licence covering the related Exploitation Area. 5.6 If in the course of work carried out after the grant of an Exploitation Licence, it appears that the area defined by the seismic closure(s) of the Field concerned is larger than originally estimated pursuant to Article 5.1, the Council of Ministers shall grant to the Contractor, as part of the Exploitation Licence already granted, an additional area so that the entirety of said Field is included in the Exploitation Area, provided, however, that the Contractor supplies the Minister, together with its application with the technical evidence of the extension so required and provided, further, that the above mentioned extension is an integral part of the Contract Area as defined at the time of said application. 5.7 Where a Field extends beyond the boundaries of the Contract Area, the Minister may, in accordance with Regulation 21 of the Regulations, require the Contractor to exploit said Field in association with the rights holder of the adjacent area under the provisions of a unitization agreement. If the Field extends beyond the Territory of the Republic, the exploitation of the said Field shall be governed by the relevant international agreements. 5.8 The duration of an Exploitation Licence during which the Contractor is authorized to carry out the exploitation of the Field covered by such licence is set at twenty-five (25) years from the date upon which such licence is granted. 5.9 The Contractor shall commence development work including the detailed engineering and design work, in accordance with the Development and Production Plan, but in no event later than six (6) months after approval thereof and shall thereafter continue it with maximum diligence. Development ▇▇▇▇▇ shall be spaced in a manner so as to ensure, in accordance with Good International Petroleum Industry Practice, the maximum economic recovery of the Hydrocarbons contained in the Field in question. During the Exploitation Licence, the Contractor shall carry out enhanced recovery studies and use such recovery processes if they may lead to an increase in Hydrocarbons recovery rate under economic conditions. 5.10 The Contractor shall produce Crude Oil from each Field at the maximum economic efficient rate (“MER”) in accordance with Good International Petroleum Industry Practice. The Minister and the Contractor shall establish the initial MER in conjunction with the adoption of the Development and Production Plan. The MER shall be reviewed annually at the time of submission of the annual Work Programme by the Contractor pursuant to Article 9 and revised, if necessary, by mutual agreement. 5.11 No later than September 30 of each Calendar Year following the start of commercial production, the Contractor shall, prepare and furnish to the Minister for approval a forecast statement setting forth by Quarters the total quantity of Crude Oil (by quality, grade and gravity) and Natural Gas that the Contractor estimates can be produced, saved and transported hereunder during the next following Calendar Year together with estimates, if available, of reserves of Hydrocarbons, broken into “proved” and “proved plus probable”. The Contractor shall endeavour to produce in each Calendar Year the forecast quantity. 5.12 Interruption for a consecutive period of at least six (6) months without the consent of the Minister of production from a Field which has commenced commercial production may give rise to the withdrawal of the Exploitation Licence concerned. For the purposes of the preceding sentence, production is not considered to be interrupted by work such as maintenance, repairs and overhauls, so long as such work, including the planning and contracting therefore, is being performed in accordance with the Development and Production Plan and with Good International Petroleum Industry Practice. 5.13 The Contractor may, at any time, fully or partially surrender any Exploitation Licence by giving at least one hundred and eighty days (180) days prior notice. Any such surrender shall be subject to the provisions of Article 10. 5.14 This Contract shall terminate upon expiration, surrender or withdrawal of the Exploitation Licence granted to the Contractor hereunder.

Appears in 2 contracts

Sources: Exploration and Production Sharing Contract, Exploration and Production Sharing Contract

Development and Production. 5.1 If the Contractor in its report under Article 4.6.5 considers that a Discovery is a Commercial Discovery, it shall submit to the Minister, within six (6) months following the date of submission of said report, an application for an Exploitation Licence accompanied by a detailed Development and Production Plan for the Field relating to said Discovery, specifying inter alia: (i) the planned delimitation of the Exploitation Area applied for by the Contractor, so that it covers the area defined by the seismic closure(s) of the Field concerned, together with all the technical justifications with respect to the extent of said Field; (ii) an estimate of the Crude Oil and/or Natural Gas reserves, their classification as proved, probable and possible according to international reserve classification practices, together with a study on the methods of recovery; (iii) the projected maximum economic efficient rate of production (MER) and expected annual production levels for Crude Oil and/or Natural Gas; (iv) the projected valuation of Crude Oil and Natural Gas to be produced; (v) the proposed Delivery Point(s) for Crude Oil and/or Natural Gas; (vi) the procedures for measuring production of Hydrocarbons at the Delivery Point(s); (vii) item by item description of the facilities, equipment and work necessary for production, such as the number of development ▇▇▇▇▇, the number of platforms, pipelines, production, processing, storage and loading facilities together with their specifications; (viii) as applicable, a marketing plan for Natural Gas, which may include the Contractor’s proposal to structure the project as an integrated or segmented gas project (including gathering, treating, and conditioning of Natural Gas for sale), accompanied by letters of intent from potential purchasers or other documents supporting the existence of a commercially viable market, including certainty of offtake; (ix) an estimated schedule for plan implementation and the projected date of production start-up; (x) estimates of all capital expenditures and operating costs, including necessary infrastructure; (xi) an environmental impact assessment study and an environmental impact management plan prepared in accordance with Applicable Environmental Legislation and Good International Petroleum Industry Environmental Practice;. (xii) a provisional Decommissioning Plan, including an estimate of the Decommissioning Costscost of Decommissioning; and (xiii) as applicable, a study on the location, design, and costing of any pipeline facilities required for the transportation of Natural Gas beyond the Delivery Point to the point of export or use, together with possible financing options; (xiv) such other matters as the Minister may reasonably require. 5.2 The Development and Production Plan submitted by the Contractor shall be subject to the approval of the Council of Ministers, which approval shall not be unreasonably withheld. Within ninety (90) days after the submission of said plan, the Minister, in consultation with other competent authorities of the Republic, may propose revisions or modifications to the Contractor’s initially proposed plan by notifying the Contractor of the substance of, and its justification for, the proposed revision(s) or modification(s). In that event, the Minister and the Contractor shall meet as soon as possible in order to consider the proposed revisions or modifications in light of Good International Petroleum Industry Practice. Promptly after the aforesaid meeting, the Contractor shall submit to the Minister a second proposed plan including any mutually agreed revisions or modifications. The Minister shall notify the Contractor of the Council of Ministers’ approval or disapproval of the second proposed plan within sixty (60) days of the date of submission of said plan. 5.3 The Contractor may not begin construction under a Development and Production Plan approved or deemed approved by the Council of Ministers until it has received all approvals required under Applicable Environmental Legislation, which approvals shall not be unreasonably withheld or delayed. 5.4 Upon a showing of reasonable technical justification for delay and a showing that the delay could not reasonably have been avoided by the Contractor in the exercise of reasonable diligence, the Contractor may request and shall receive an extension of up to twelve (12) months in the date for delivery of its proposed Development and Production Plan under Article 5.1. If the Contractor fails to deliver its proposed Development and Production Plan within the time required under this Article 5, taking into account any extension granted under this Article 5.4, the Minister may require by notice to the Contractor that unless the Contractor has delivered its proposed Development and Production Plan within thirty (30) days after the date the Contractor receives such notice, the Contractor will be deemed to have surrendered all its rights in respect of the Appraisal Area without any compensation for the Contractor, and the Contractor will forfeit all its rights on Hydrocarbons which could be produced from said discovery. 5.5 Within thirty (30) days from the date of approval or deemed approval of a Development and Production Plan, the Council of Ministers shall grant to the Contractor an Exploitation Licence covering the related Exploitation Area. 5.5.1 If the Contractor makes Commercial Discoveries of several Fields in the Contract Area, each such Discovery shall give rise to an Exploitation Licence each corresponding to an Exploitation Area. The number of Exploitation Licences and related Exploitation Areas within the Contract Area shall not be limited. 5.6 If in the course of work carried out after the grant of an Exploitation Licence, it appears that the area defined by the seismic closure(s) of the Field concerned is larger than originally estimated pursuant to Article 5.1, the Council of Ministers shall grant to the Contractor, as part of the Exploitation Licence already granted, an additional area so that the entirety of said Field is included in the Exploitation Area, provided, however, that the Contractor supplies the Minister, together with its application with the technical evidence of the extension so required and provided, further, that the above mentioned extension is an integral part of the Contract Area as defined at the time of said application. 5.7 Where a Field extends beyond the boundaries of the Contract Area, the Minister may, in accordance with Regulation 21 of the Regulations, require the Contractor to exploit said Field in association with the rights holder of the adjacent area under the provisions of a unitization agreement. If the Field extends beyond the Territory of the Republic, the exploitation of the said Field shall be governed by the relevant international agreements. 5.8 The duration of an Exploitation Licence during which the Contractor is authorized to carry out the exploitation of the Field covered by such licence is set at up to twenty-five (25) years from the date upon which such licence is granted. 5.9 The Contractor undertakes to perform at its own expense and financial risk all Hydrocarbons Operations for placing the Field in exploitation and production, in accordance with the Development and Production Plan approved. 5.10 On expiry or earlier revocation of the Exploitation Licence, the Contractor shall relinquish the Exploitation Area related to such Exploitation Licence and the Exploitation License shall terminate. 5.11 The Contractor shall commence development Development work including the detailed engineering and design work, in accordance with the Development and Production Plan, but in no event later than six (6) months after approval thereof and shall thereafter continue it with maximum diligence. Development ▇▇▇▇▇ shall be spaced in a manner so as to ensure, in accordance with Good International Petroleum Industry Practice, the maximum economic recovery of the Hydrocarbons contained in the Field in question. During the Exploitation Licence, the Contractor shall carry out enhanced recovery studies and use such recovery processes if they may lead to an increase in Hydrocarbons recovery rate under economic conditions. 5.10 The Contractor shall produce Crude Oil from each Field at the maximum economic efficient rate (“MER”) in accordance with Good International Petroleum Industry Practice. The Minister and the Contractor shall establish the initial MER in conjunction with the adoption of the Development and Production Plan. The MER shall be reviewed annually at the time of submission of the annual Work Programme by the Contractor pursuant to Article 9 and revised, if necessary, by mutual agreement. 5.11 No later than September 30 of each Calendar Year following the start of commercial production, the Contractor shall, prepare and furnish to the Minister for approval a forecast statement setting forth by Quarters the total quantity of Crude Oil (by quality, grade and gravity) and Natural Gas that the Contractor estimates can be produced, saved and transported hereunder during the next following Calendar Year together with estimates, if available, of reserves of Hydrocarbons, broken into “proved” and “proved plus probable”. The Contractor shall endeavour to produce in each Calendar Year the forecast quantity. 5.12 Interruption for a consecutive period of at least six (6) months without the consent of the Minister of production from a Field which has commenced commercial production may give rise to the withdrawal of the Exploitation Licence concerned. For the purposes of the preceding sentence, production is not considered to be interrupted by work such as maintenance, repairs and overhauls, so long as such work, including the planning and contracting therefore, is being performed in accordance with the Development and Production Plan and with Good International Petroleum Industry Practice. 5.13 The Contractor may, at any time, fully or partially surrender any Exploitation Licence by giving at least one hundred and eighty days (180) days prior notice. Any such surrender shall be subject to the provisions of Article 10. 5.14 This Contract shall terminate upon expiration, surrender or withdrawal of the Exploitation Licence granted to the Contractor hereunder.

Appears in 1 contract

Sources: Exploration and Production Sharing Contract

Development and Production. 5.1 If the Contractor in its report under Article 4.6.5 considers that a Discovery is a Commercial Discovery, it shall submit to the Minister, within six four (64) months following the date of submission of said report, an application for an Exploitation Licence accompanied by a detailed Development and Production Plan for the Field relating to said Discovery, specifying inter alia: (i) the planned delimitation of the Exploitation Area applied for by the Contractor, so that it covers the area defined by the seismic closure(s) of the Field concerned, together with all the technical justifications with respect to the extent of said Field; (ii) an estimate of the Crude Oil and/or Natural Gas reserves, their classification as proved, probable and possible according to international reserve classification practicespractices , together with a study on the methods of recovery; (iii) the projected maximum economic efficient rate of production (MER) and expected annual production levels for Crude Oil and/or Natural Gas; (iv) the projected valuation of Crude Oil and Natural Gas to be produced; (v) the proposed Delivery Point(s) for Crude Oil and/or Natural Gas; (vi) the procedures for measuring production of Hydrocarbons at the Delivery Point(s); (vii) item by item description of the facilities, equipment and work necessary for production, such as the number of development ▇▇▇▇▇, the number of platforms, pipelines, production, processing, storage and loading facilities together with their specifications; (viii) as applicable, a marketing plan for Natural Gas, which may include the Contractor’s proposal to structure the project as an integrated or segmented gas project (including gathering, treating, and conditioning of Natural Gas for sale), accompanied by letters of intent from potential purchasers or and other documents supporting the existence of a commercially viable market, including certainty of offtakemarket ; (ix) an estimated schedule for plan implementation and the projected date of production start-up; (x) estimates of all capital expenditures and operating costs, including necessary infrastructure; (xi) an environmental environment impact assessment study and an environmental environment impact management plan prepared in accordance with Applicable Environmental Legislation and Good International Petroleum Industry Environmental Practice; (xii) a provisional Decommissioning Plan, including an estimate of the Decommissioning Costs; and (xiii) as applicable, a study on the location, design, and costing of any pipeline facilities required for the transportation of Natural Gas beyond the Delivery Point to the point of export or use, together with possible financing options. 5.2 The Development and Production Plan submitted by the Contractor shall be subject to the approval of the Council of Ministers, which approval shall not be unreasonably withheld. Within ninety (90) days after the submission of said plan, the Minister, in consultation with other competent authorities of the Republic, may propose revisions or modifications to the Contractor’s initially proposed plan by notifying the Contractor of the substance of, and its justification for, the proposed revision(s) or modification(s). In that event, the Minister and the Contractor shall meet as soon as possible in order to consider the proposed revisions or modifications in light of Good International Petroleum Industry Practice. Promptly after the aforesaid meeting, the Contractor shall submit to the Minister a second proposed plan including any mutually agreed revisions or modifications. The Minister shall notify the Contractor of the Council of Ministers’ approval or disapproval of the second proposed plan within sixty (60) days of the date of submission of said plan. 5.3 The Contractor may not begin construction under a Development and Production Plan approved or deemed approved by the Council of Ministers Minister until it has received all approvals required under Applicable Environmental Legislation, which approvals shall not be unreasonably withheld or delayed. 5.4 Upon a showing of reasonable technical justification for delay and a showing that the delay could not reasonably have been avoided by the Contractor in the exercise of reasonable diligence, the Contractor may request and shall receive an extension of up to twelve (12) months in the date for delivery of its proposed Development and Production Plan under Article 5.1. If the Contractor fails to deliver its proposed Development and Production Plan within the time required under this Article 5, taking into account any extension granted under this Article 5.4, the Minister may require by notice to the Contractor that unless the Contractor has delivered its proposed Development and Production Plan within thirty (30) days after the date the Contractor receives such notice, the Contractor will be deemed to have surrendered all its rights in respect of the Appraisal Area without any compensation for the Contractor, and the Contractor will forfeit all its rights on Hydrocarbons which could be produced from said discovery.the 5.5 Within thirty (30) days from the date of approval or deemed approval of a Development and Production Plan, the Council of Ministers shall grant to the Contractor an Exploitation Licence covering the related Exploitation Area. 5.6 If in the course of work carried out after the grant of an Exploitation Licence, it appears that the area defined by the seismic closure(s) of the Field concerned is larger than originally estimated pursuant to Article 5.1, the Council of Ministers shall grant to the Contractor, as part of the Exploitation Licence already granted, an additional area so that the entirety of said Field is included in the Exploitation Area, provided, however, that the Contractor supplies the Minister, together with its application with the technical evidence of the extension so required and provided, further, that the above mentioned extension is an integral part of the Contract Area as defined at the time of said application. 5.7 Where a Field extends beyond the boundaries of the Contract Area, the Minister may, in accordance with Regulation 21 of the Regulations, require the Contractor to exploit said Field in association with the rights holder of the adjacent area under the provisions of a unitization agreement. If the Field extends beyond the Territory of the Republic, the exploitation of the said Field shall be governed by the relevant international agreements. 5.8 The duration of an Exploitation Licence during which the Contractor is authorized to carry out the exploitation of the Field covered by such licence is set at twenty-five (25) years from the date upon which such licence is granted.five 5.9 The Contractor shall commence development work including the detailed engineering and design work, in accordance with the Development and Production Plan, but in no event later than six (6) months after approval thereof and shall thereafter continue it with maximum diligence. Development ▇▇▇▇▇ shall be spaced in a manner so as to ensure, in accordance with Good International Petroleum Industry Practice, the maximum economic recovery of the Hydrocarbons contained in the Field in question. During the Exploitation Licence, the Contractor shall carry out enhanced recovery studies and use such recovery processes if they may lead to an increase in Hydrocarbons recovery rate under economic conditions. 5.10 The Contractor shall produce Crude Oil from each Field at the maximum economic efficient rate (“MER”) in accordance with Good International Petroleum Industry Practice. The Minister and the Contractor shall establish the initial MER in conjunction with the adoption of the Development and Production Plan. The MER shall be reviewed annually at the time of submission of the annual Work Programme by the Contractor pursuant to Article 9 and revised, if necessary, by mutual agreement. 5.11 No later than September 30 of each Calendar Year following the start of commercial production, the Contractor shall, prepare and furnish to the Minister for approval a forecast statement setting forth by Quarters the total quantity of Crude Oil (by quality, grade and gravity) and Natural Gas that the Contractor estimates can be produced, saved and transported hereunder during the next following Calendar Year together with estimates, if available, of recoverable reserves of Hydrocarbons, broken into “proved” and “proved plus probable”. The Contractor shall endeavour to produce in each Calendar Year the forecast quantity. All produced Hydrocarbons shall be run to storage tanks constructed, maintained and operated by the Contractor in accordance with the Development and Production Plan. 5.12 Interruption for a consecutive period of at least six (6) months without the consent of the Minister of production from a Field which has commenced commercial production may give rise to the withdrawal of the Exploitation Licence concerned. For the purposes of the preceding sentence, production is not considered to be interrupted by work such as maintenance, repairs and overhauls, so long as such work, including the planning and contracting therefore, is being performed in accordance with the Development and Production Plan and with Good International Petroleum Industry Practice. 5.13 The Contractor may, at any time, fully or partially surrender any Exploitation Licence by giving at least one hundred and eighty days (180) days prior notice. Any such surrender shall be subject to the provisions of Article 10. 5.14 This Contract shall terminate upon expiration, surrender or withdrawal of the last Exploitation Licence granted to the Contractor hereunder.

Appears in 1 contract

Sources: Model Exploration and Production Sharing Contract