Design Information Sample Clauses

Design Information. For the purpose of developing agreed measures pursuant to Section V of this Annex, the Parties shall identify an agreed set of design information to be provided to the monitoring Party for disposition facilities. Once the set of design information is identified, that information shall be provided to the monitoring Party at an agreed time. The monitoring Party shall be allowed access to disposition facilities before operations and thereafter, as necessary to confirm design information, using agreed procedures.
AutoNDA by SimpleDocs
Design Information. 2.1 Basis of Design (BOD) Summary 25759-100-3BD-M04-00001 00A Basis of Design
Design Information. All non-proprietary project design information including sufficient background information to provide an overview of the project and to serve as a reference for the design considerations involved in a commercial-scale CO2 delivery, geologic injection and MVA operation. This includes a non- proprietary overview description of the technology/systems; non-proprietary process performance requirements and the evaluations and operating philosophies upon which those performance requirements are based; a complete set of non-proprietary equipment plot and elevation drawings, and process and instrumentation diagrams, which describe the operational configuration; and non-proprietary experimental methods (by description or reference).
Design Information. 4.1 RAC logic schematics -------------------- These schematics describe logic operation of the RAC interface. Rambus will provide both hardcopy and Cadence format of these approximately 10 pages of schematics. -42-
Design Information. The Company's drawings, details, etc If, and to the extent, that the Contractor is entitled to information, drawings, details and documents from the Company pursuant to the Contract, and the same is necessary in order to enable the Contractor to comply with the Contract, the Contractor shall notify the Company timeously setting out details of the information required and the time by which it is reasonably necessary to receive the same. Condition Precedent Notice It shall be a condition precedent to the Contractor's right to rely upon the Company's failure to provide such necessary information, drawings, details and documents as are required by the terms of the Contract that the Contractor shall have complied with the requirements of clause 2.1. Submission of drawings etc The Contractor shall submit to the Company such information, drawings, details and documents as are required by the Contract and/or as necessary in order to enable the Contractor to execute and complete the Contract Works ("Design Information"), sufficiently prior to the commencing of the relevant parts of the Contract Works, having regard to the timing and sequence of the Project, the Contract Works and the requirements of this clause 2. Approval/ Disapproval of drawings etc The Company shall designate the Design Information as follows: "A" Proceed, with no comment; "B" Proceed, but take note of comments made; "C" Rejected. Must be resubmitted. If the Company fails to respond within 14 days of the date of receipt of any Design Information, then provided that the Contractor shall have made reasonable enquiries to establish the Design Information was received by the Company they shall be deemed to have an "A status" under clause 2.4. Proceeding with the Contract Works The Contractor shall not proceed with the relevant part of the Contract Works until all of the relevant Design Information has received "A" or "B" status under clause 2.4. Effect of approval and/or comments No approval or comment of the Company under clause 2.4 hereof shall in any way relieve the Contractor of its obligations to carry out and complete the Contract Works in accordance with the Contract, or in any way relieve the Contractor from its responsibility for the same.
Design Information. PeopleReady, Inc. does not currently have special requirements for protection of Critical Nuclear Weapons Design Information (CNDWI). In the event that future contracts require this kind of access, PeopleReady, Inc. will implement procedures and comply with 32 CFR 117.20.
Design Information. This section describes important files used in the layout process. Timing constraint file information: File Released to FMA: Date and Checksum : Note: Final layout data files information: POWER CALCULATION Typical power consumption: Process : Tj : VDDE : VDDI : ATG Fault coverage % [date] Page 7 FMA Doc. No.:
AutoNDA by SimpleDocs
Design Information. 5.1 Time for issuing the design information
Design Information. The conveyor system and its associated equipment should be suitable for outdoors operation in climatic conditions prevailing at Majuba Power Station site, without undue maintenance and deterioration. Standardisation of equipment utilised throughout the system as well as with existing plant must be attempted as far as practically possible.
Design Information. All non-proprietary project design information with sufficient background information to provide an overview of the project and to serve as a reference for the design considerations involved in a commercial-scale facility. This includes a non-proprietary overview description of the technology; non-proprietary process performance and the evaluations and operating philosophies upon which that performance is based; a set of non-proprietary equipment plot and elevation drawings, and process and instrumentation diagrams, which describe the plant configuration; and, non-proprietary experimental methods (by description or reference).
Time is Money Join Law Insider Premium to draft better contracts faster.