Cross Slope Clause Samples
Cross Slope. Construct a pavement surface with cross slopes in compliance with the requirements of the Contract Documents.
Cross Slope. (1) No more than a 1:50 (2%) cross slope shall be constructed on a walkway that is an accessible route.
Cross Slope. Construct a pavement surface with cross slopes in compliance with the requirements of the Contract Documents. Furnish a level with a minimum length of 4 feet or a digital measuring device approved by the Engineer for the control of cross slope. Make this level or measuring device available at the jobsite at all times during paving operations. Utilize electronic transverse screed controls on the paving machine (unless directed otherwise by the Engineer) to obtain an accurate transverse slope of the pavement surface.
