Common use of Conveyance Elements Clause in Contracts

Conveyance Elements. In order to properly determine culvert information for each culvert crossing, survey data was collected by ▇▇▇▇▇▇▇▇ & ▇▇▇▇▇▇ Inc. The pipe diameter was measured, the length and inverts located then surveyed. This information was the foundation for the model representation of the hydraulic system. In addition to the structure inventory, cross- section survey information of natural channels was obtained at selected points along the canals and creeks. In order to represent channel floodplains, survey data was extended in the hydraulic model based on the topographic maps in order to represent channel floodplains. A copy of the survey data is included in Exhibits 3-1 and 3-2.

Appears in 2 contracts

Sources: Mitigation Bank Instrument, Mitigation Bank Instrument