Contractor Quality Control for Compaction Clause Samples
Contractor Quality Control for Compaction. Contractor shall arrange for calibration samples to be provided to the Testing Agency (Project Office and District Laboratory) so that each ignition oven can be calibrated to perform AASHTO T 308 in accordance with the State Materials Bureau’s Ignition Oven Calibration Factors Procedures. This will be incidental to the Hot Mix Asphalt. The following are the MINIMUM TESTING REQUIREMENTS FOR NON-QLA HOT MIX ASPHALT: Roadway Density Agency Testing 1 per 300 tons Roadway Density Independent Assurance 2 per project min. Gradation Agency Testing 1 per day Gradation Independent Assurance 2 per project min. Acceptance for hot mix asphalt density will be based on roadway densities utilizing a portable nuclear densometer.
