Contraction Joints. The position of construction joints will be as specified in the drawings by the designer. If there is a need on site to revise any specified position /or/ to have additional construction joints the proposed positions should be agreed with the Engineer. Full structural continuity must be assumed in design at a construction joint. Reinforcement will be fully continuous across the joint, and the concrete is taken to be as nearly monolithic as possible. The concrete at the joints should be bonded with the one subsequently placed against it, without provision for relative movement between the two. Concrete should not be allowed to run to a feather edge, and vertical joints should be formed against a stop end. Particular care should be taken when framing the joint. The surface of the first pour should be roughened to increase the bond strength and to provide aggregate interlock. With horizontal joints, the joint surface should be roughened without disturbing the coarse aggregate particles, by spraying the joint surface approximately 2h to 4h after the concrete is placed, with a fine spray water and/or brushing with stiff brush. Vertical joints can be treated similarly, if the use of a retarder on the top is authorised, to enable the joint surface to be treated after the stop end has been removed. If the joint surface is not roughened until the concrete has hardened, the larger aggregate particles near the surface should be exposed by sand blasting or by applying a scaling hammer or other mechanical advice. Care should be taken that the joint surface is clean immediately before the fresh concrete is placed against the old one. It may need to be dampened prior to the new concrete being placed, to prevent excessive loss of mix water into it by absorption. Particular care should be taken in placing of new concrete close to the joint to ensure that it has adequate fines content and is fully compacted and dense. N.B. When instructed by the Engineer in designing construction joints for retaining aqueous liquids it is necessary to incorporate waterstops in properly constructed joints. Construction joints shall be formed only in the positions shown in the drawings or indicated by the Engineer and concreting shall be carried out continuously between and up to joints. All intersections of construction joints, permanently exposed, shall be made absolutely straight and level or plumb and matching with adjacent members. Construction joint shall be formed at right angles to the axis of the member concerned, by the insertion of rigid stopping-off forms in the case of horizontal or inclined members. The upper surface of lifts of concrete in walls and columns shall be horizontal. The surface of the stopping-off form /or/ the horizontal surface shall be indented to produce a key the old and new work. The face of the horizontal joints brushed and roughened shall be rendered with a 1.0 to 1.5 cm thick layer of cement-sand mortar having the same relative proportions of cement and sand (without coarse aggregate) and the same water-cement ratio as the concrete to be placed upon it, and the new concrete shall then be laid immediately upon it and thoroughly punned in. Where joints will be permanently visible, the mortar shall be kept back at least 25mm from the exposed face. In the case of vertical joint the face shall be rendered with a coat of neat cement placed immediately before each fresh lift of new concrete. NB : No Day Joints /or/ Stopping-off joints will be permitted in water retaining structures. Pouring operations shall be continuous between joints as shown in the drawings. The Contractor shall have sufficient materials and standby equipment to meet these requirements. Where due to accident or breakdown it is impossible to continue concreting, the Engineer /or/ his Representative shall be immediately notified and his verbal instructions which shall be confirmed in writing as soon as possible, regarding either the making of a construction joint /or/ the taking out of new concrete back to the last construction joints, shall be complied with immediately.
Appears in 2 contracts
Sources: Construction Contract, Construction Contract