Comparison of Typical Cement Feedstock and F006 Sludge Composition Sample Clauses

Comparison of Typical Cement Feedstock and F006 Sludge Composition. Cement is a combination of the oxides of calcium, silicon, aluminum, and iron with lime and silica comprising approximately 85% of its mass. Common materials that are utilized in the ♦ 1506/FPAFINAL.DOC 2-13 TABLE 2-6 INTERNATIONAL BUSINESS MACHINES CORPORATION EAST FISHKILL FACILITY B/690 F/HM WASTEWATER TREATMENT FACILITY SLUDGE SAMPLING TOTAL ANALYTICAL RESULTS VOLATILE ORGANIC COMPOUNDS BUILDING B/690 SAMPLE IDENTIFICATION CA-F Grab DATE OF COLLECTION 2/8/99 DILUTION FACTOR 1 PERCENT SOLIDS 39.5 UNITS (ug/kg) Chloromethane U Vinyl Chloride U Bromomethane U Chloroethane U Trichlorofluoromethane U 1,1-Dichloroethene U Methylene Chloride 3.6 trans-1,2-Dichloroethene U 1,1-Dichloroethane U 2,2-Dichloropropane U cis-1,2-Dichloroethene U Bromochloromethane U Chloroform U Carbon Tetrachloride U Benzene U 1,2-Dichloroethane U 1,1-Dichloropropene U Trichloroethene U 1,2-Dichloropropane U Dibromomethane U Bromodichloromethane U cis-1,3-Dichloropropene U Toluene 1.6 J trans-1,3-Dichloropropene U 1,1,2-Trichloroethane U 1,2-Dibromoethane U Tetrachloroethene U 1,3-Dichloropropane U Dibromochloromethane U Chlorobenzene U 1,1,1,2-Tetrachloroethane U Ethylbenzene U o-Xylene 2.1 J m,p-Xylene 4.2 TABLE 2-6 (continued) INTERNATIONAL BUSINESS MACHINES CORPORATION EAST FISHKILL FACILITY B/690 F/HM WASTEWATER TREATMENT FACILITY SLUDGE SAMPLING TOTAL ANALYTICAL RESULTS VOLATILE ORGANIC COMPOUNDS BUILDING B/690 SAMPLE IDENTIFICATION CA-F Grab DATE OF COLLECTION 2/8/99 DILUTION FACTOR 1 PERCENT SOLIDS 39.5 UNITS (ug/kg) Styrene U Bromoform U Isopropylbenzene U Bromobenzene U 1,1,1-Trichloroethane U 1,1,2,2-Tetrachloroethane U 1,2,3-Trichloropropane U n-Propylbenzene U 2-Chlorotoluene U 4-Chlorotoluene U 1,3,5-Trimethylbenzene U tert-Butylbenzene U 1,2,4-Trimethylbenzene 2.7 sec-Butylbenzene U 1,3-Dichlorobenzene U 4-Isopropyltoluene U 1,4-Dichlorobenzene U 1,2-Dichlorobenzene U n-Butylbenzene U 1.2-Dibromo-3-chloropropane U 1,2,4-Trichlorobenzene U Hexachlorobutadiene U Naphthalene U 1,2,3-Trichlorobenzene U Dichlorodifluoromethane U Formaldehyde U TOTAL VOCs 14.2 Qualifiers: U: Compound analyzed for but not detected.
AutoNDA by SimpleDocs

Related to Comparison of Typical Cement Feedstock and F006 Sludge Composition

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

Time is Money Join Law Insider Premium to draft better contracts faster.