Commissioning Test Procedures Sample Clauses

Commissioning Test Procedures. When a new interconnection metering and/or DAS equipment is installed, replaced or upgraded, a commissioning test shall be performed based on mutually agreed test procedure. Before the equipment is officially placed in service, the following processes shall be followed, as a minimum requirement. The owner of the equipment shall inform the Other Party of the commissioning test. The owner of the equipment will provide a three-way conference call between the interconnection site and operation centers of both Parties. Bidirectional test currents shall be injected to the interconnection energy meter and the instantaneous analog data values displayed by the meter shall be checked against the corresponding readings received at each control center. This verification test will be made at the 0, 2.5 and 5 Amp cases, and with unity and 50% power factors. The pulse accumulator counter data shall be tested in the same manner and the accumulator freeze functionality shall be verified. A “roll-over” count test will be performed for each accumulator data point in order to verify the “roll-over” count is properly processed by both operation centers.
AutoNDA by SimpleDocs
Commissioning Test Procedures. When new interconnection metering and/or DAS equipment is installed, replaced or upgraded, a commissioning test shall be performed based on a mutually agreed test procedure. Before the equipment is officially placed in service, the following processes shall be followed, as a minimum requirement: The Owning Party shall inform the Requesting Party of the commissioning test. The Owning Party will coordinate a three-way conference call between the interconnection site and operation centers of both Parties. Bidirectional test currents shall be injected to the interconnection energy meter and the instantaneous analog data values displayed by the meter shall be checked against the corresponding readings received at each control center. This verification test will typically be made at the minimum, midpoint and max cases (typically 0, 2.5 and 5 Amp), and with unity and 50% power factors. The pulse accumulator counter data shall be tested in the same manner and the accumulator freeze functionality shall be verified. A “roll-over” count test will be performed for each accumulator data point in order to verify the “roll-over” count is properly processed by both operation centers.

Related to Commissioning Test Procedures

  • Test Procedures For an Asset Review, the Asset Representations Reviewer will perform for each Asset Review Receivable the procedures listed under “Procedures to be Performed” in Schedule A for each representation and warranty (each, a “Test”), using the Asset Review Materials listed for each such Test in Schedule A. For each Test and Asset Review Receivable, the Asset Representations Reviewer will determine if the Test has been satisfied (a “Test Pass”) or if the Test has not been satisfied (a “Test Fail”).

  • Test procedure The engine speed shall be gradually increased from idle to the target engine speed, not exceeding the tolerance band of ±3 per cent of the target engine speed, and held constant. Then the throttle control shall be rapidly released and the engine speed shall be returned to idle. The sound pressure level shall be measured during a period of operation consisting of a maintaining constant engine speed of 1 second and throughout the entire deceleration period. The maximum sound level meter reading during this period of operation, mathematically rounded to the first decimal place, is taken as the test value.

  • Procurement procedures 11.1 The Recipient must secure the best value for money and shall act in a fair, open and non-discriminatory manner in all purchases of goods and services.

  • Conformity Assessment Procedures 1. The Parties recognise that a broad range of mechanisms exist to facilitate the acceptance of conformity assessment results, including:

  • Quality Control Procedures The Seller shall have an internal quality control program that verifies, on a regular basis, the existence and accuracy of the legal documents, credit documents, property appraisals, and underwriting decisions. The program shall include evaluating and monitoring the overall quality of the Seller's loan production and the servicing activities of the Seller. The program is to ensure that the Mortgage Loans are originated and serviced in accordance with Accepted Servicing Standards and the Underwriting Guidelines; guard against dishonest, fraudulent, or negligent acts; and guard against errors and omissions by officers, employees, or other authorized persons.

  • AML/KYC Procedures “AML/KYC Procedures” means the customer due diligence (CDD) procedures of a Reporting Financial Institution pursuant to the anti-money laundering or similar requirements of the jurisdiction concerned to which such Reporting Financial Institution is subject.

  • Monthly MWBE Contractor Compliance Report A. In accordance with 5 NYCRR § 142.10, Contractor is required to report Monthly MWBE Contractor Compliance to OGS during the term of the Contract for the preceding month’s activity, documenting progress made towards achievement of the Contract MWBE goals. OGS requests that all Contractors use the New York State Contract System (“NYSCS”) to report subcontractor and supplier payments made by Contractor to MWBEs performing work under the Contract. The NYSCS may be accessed at xxxxx://xx.xxxxxxxxxxxxxx.xxx/. This is a New York State-based system that all State agencies and authorities will be implementing to ensure uniform contract compliance reporting throughout New York State.

  • WARRANTY PROCEDURES You need proof of purchase for warranty service.

  • Other Procurement Procedures The following procurement methods may be used for the procurement of works and goods that the Bank agrees meets the requirements established in the provisions of Section III of the Procurement Policies:

  • Loop Testing/Trouble Reporting 2.1.6.1 TeleConex will be responsible for testing and isolating troubles on the Loops. TeleConex must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, TeleConex will be required to provide the results of the TeleConex test which indicate a problem on the BellSouth provided Loop.