CLIENT DESCRIPTION Sample Clauses

CLIENT DESCRIPTION. CHARACTERISTICS
AutoNDA by SimpleDocs
CLIENT DESCRIPTION. City of Xxxxxx is requesting a statement of work to provide the services that would increase the Utility User Tax (UUT) from 1% to 6% for all customers exempting all Residential accounts and also provide a 5% tax credit on all utilities to offset the increase. The UUT credit will be changeable by Vernon’s internal staff for the future rate decreases or increases. These changes will be effective as Xxxxxx goes Live in CIS Infinity V4.

Related to CLIENT DESCRIPTION

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Service Description The Parties will provide Common Channel Signaling (CCS) to one another via Signaling System 7 (SS7) network Interconnection, in accordance with prevailing industry standards. Use of a third party provider of SS7 trunks is permitted.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • Product Description The lead products covered by this Settlement Agreement are limited to following Amazon Identification Number (ASIN) B07CZ1Z8QK, with the description, "63/37 Rosin Core Solder Wire Flux 2% Tin Lead Solder Iron Welding Wire Reel 0.5mm-2.0mm 50g/100g," which was offered for sale by the Settling Entity on xxxxxx.xxx, hereinafter the “Product” or “Products.”

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

Time is Money Join Law Insider Premium to draft better contracts faster.