CLEANUP WORK Sample Clauses

CLEANUP WORK. 23.1 Vendor shall, at its own expense, at all times keep the Site free from accumulation of debris, waste material, and rubbish, and at the completion of the work, it shall remove its tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the Site and the Property in a neat and clean condition upon the completion of this Contract.
CLEANUP WORK a. During construction, the Contractor shall keep the worksite, areas adjacent to the worksite and access roads in an orderly condition, free and clear from debris and discarded materials. Care shall be taken to prevent spillage when hauling is being done. Any spillage or debris resulting from the Contractor's operations shall be immediately removed. b. Upon completion of the work the Contractor shall remove from the worksite, areas adjacent to the worksite and access roads all plant, building, debris, unused material, and other material belonging to the Contractor or used under the Contractor’s direction during construction. The Contractor shall repair all damage caused by the Contractor to a condition that equals or exceeds the condition at the start of the work. c. The Contractor shall repair any damage caused by the project work to private access roads and adjacent landscaped areas. Repair work shall restore damaged areas to the original condition. Such repairs shall be made in a timely manner and shall be inspected by the District Engineer prior to completion of contract work. d. Areas used to temporarily store equipment, and/or other construction materials shall be returned to a pre-project condition. The Contractor shall identify such areas to the District Engineer, who shall review and approve the location. All areas that are disturbed or compacted by heavy equipment shall be returned to pre-project conditions.