Common use of Cleaning the Project Clause in Contracts

Cleaning the Project. A. Each Prime Contractor shall keep the building and grounds maintained free from accumulations of waste materials, rubbish and debris. B. The Contractor shall maintain a clean and safe passageway for the Department, the Professional and others utilizing the facility. 1. Each Contractor shall insure that their Work shall not damage streets connecting to the Project, which shall be protected, from mud, sand, and stones/gravel. Streets and adjacent property sites shall be kept free from run-off, litter, and/or debris in any form from the project site. Mud, litter, and/or debris from the construction site that appears on adjacent property sites shall be removed immediately. All mud collected on vehicle tires shall be removed by each Contractor before leaving the construction area. If any mud or debris from the project site collects on the streets, it shall be removed immediately by the responsible Contractor to prevent any hazards to vehicular or pedestrian traffic, as well as from entering the storm sewer system. All streets and property sites adjacent to the project site shall be cleaned of construction related debris, dust, litter, and mud daily. 2. Each Contractor is prohibited from discharging any waste products from concrete trucks or from concrete coring work, or any other unsuitable materials, fluids or other products on the site, or into the storm sewer system. 3. If the responsible Prime Contractor fails to comply with these requirements, the Department reserves the right, with twenty-four (24) hours prior notice to the responsible Prime Contractor, to assign another Contractor to clean and/or remove mud, trash, litter, debris, or any unauthorized discharge from the project and/or the adjacent streets or properties. In such case, the cost of the cleaning and/or removal, or mobilization for cleaning and/or removal shall be deducted by the Department from the responsible Prime Contractor’s next Applications for Payment. C. The Contractor, and subcontractors of any tier, shall be responsible for and include in its bid, the cost for cleanup and removal from the site of its identifiable debris including, but not limited to, bulky debris, packaging containers, unused materials and equipment, and materials unsuitable for disposal by standard commercial procedures (i.e., masonry and concrete materials, crates, combustible items, etc.). D. If the Contractor(s) fails to maintain a satisfactory cleanup program, the Department will issue a twenty-four (24) hour written notice of deficiency. If the Contractor does not respond to the written notice from the Department, then the Department shall arrange for the performance of the cleanup and backcharge the Contractor(s) for all costs associated with the cleanup. E. All construction salvage materials, not including items specified elsewhere to be returned to the Department, become the property of the Contractor and shall be taken from the premises. On-site storage of materials and equipment, other than for use in this Project, will not be permitted. F. No rubbish or debris shall be dropped from a height of more than six feet, or thrown out of any window or opening without a chute. G. The following, which is not all-inclusive, lists the cleaning levels required by each Contractor as applicable to the scope of Work included in its Contract prior to Final Inspection: 1. Remove labels which are not required as permanent labels; 2. Clean transparent materials, including mirrors and window/door glass, to a polished condition; 3. Remove substances which are noticeable as vision-obscuring materials; 4. Clean exposed exterior and interior hard-surfaced finishes to a dirt-fee condition, free of dust, stains, paint splatters, films and similar noticeable distracting substances. Except as otherwise indicated, avoid disturbance of natural weathering of exterior surfaces. Restore reflective surfaces to original reflective condition; 5. Clean concrete floors; in non-occupied spaces, broom clean; remove all stains, marks, paint, rust, etc. caused by construction activities. 6. Clean plumbing fixtures to a sanitary condition, free of stains, including those resulting from water exposure; and 7. Clean mechanical and electrical equipment, ductwork and replace all filters. H. Prior to Final Inspection, in addition to the cleaning specified above, the site shall be prepared for occupancy by a thorough cleaning, including removal of all trash, rocks, wood and or debris as required. Roadways and sidewalks shall be washed and swept clean. These activities shall be coordinated by the Lead Contractor. I. Before the acceptance of the Project by the Department at the Final Inspection, all visible finished surfaces and materials shall be thoroughly cleaned and/or retouched by the responsible Contractor at its own cost and shall be left in a clean and unblemished condition to the satisfaction of the Department. Surfaces that are to be finished shall have all plaster, mortar and other surplus materials removed before beginning painting, varnishing and other finishing.

Appears in 2 contracts

Sources: Construction Contract, Construction Contract

Cleaning the Project. A. Each Prime Contractor shall keep the building and grounds maintained free from accumulations of waste materials, rubbish and debris. B. The Contractor shall maintain a clean and safe passageway for the Department, the Professional and others utilizing the facility. 1. Each Contractor shall insure that their Work shall not damage streets connecting to the Project, which shall be protected, from mud, sand, and stones/gravel. Streets and adjacent property sites shall be kept free from run-off, litter, and/or debris in any form from the project site. Mud, litter, and/or debris from the construction site that appears on adjacent property sites shall be removed immediately. All mud collected on vehicle tires shall be removed by each Contractor before leaving the construction area. If any mud or debris from the project site collects on the streets, it shall be removed immediately by the responsible Contractor to prevent any hazards to vehicular or pedestrian traffic, as well as from entering the storm sewer system. All streets and property sites adjacent to the project site shall be cleaned of construction related debris, dust, litter, and mud daily. 2. Each Contractor is prohibited from discharging any waste products from concrete trucks or from concrete coring work, or any other unsuitable materials, fluids or other products on the site, or into the storm sewer system. 3. If the responsible Prime Contractor fails to comply with these requirements, the Department reserves the right, with twenty-four (24) hours prior notice to the responsible Prime Contractor, to assign another Contractor to clean and/or remove mud, trash, litter, debris, or any unauthorized discharge from the project and/or the adjacent streets or properties. In such case, the cost of the cleaning and/or removal, or mobilization for cleaning and/or removal shall be deducted by the Department from the responsible Prime Contractor’s next Applications for Payment. C. The Contractor, and subcontractors of any tier, shall be responsible for and include in its bid, the cost for cleanup and removal from the site of its identifiable debris including, but not limited to, bulky debris, packaging containers, unused materials and equipment, and materials unsuitable for disposal by standard commercial procedures (i.e., masonry and concrete materials, crates, combustible items, etc.). D. Construction debris and rubbish generated by a Contractor's activity shall be removed by the Contractor from the point of origin daily and shall not be allowed to accumulate. Open rubbish piles are not allowed. The Department shall have the right to establish a clean-up routine. The Contractor will be expected to participate fully in this routine. E. All Prime Contractors shall cooperate with each other and shall use reasonable diligence and make every effort, in connection with their Work, to avoid excessive dirt, rubbish and general refuse and to minimize the extent of cleaning and removal thereof required of each Prime Contractor. F. Without relieving the Contractors and subcontractors from any of their respective obligations hereunder, the Contractors may, if they so desire, make their own arrangements for cooperative effort in keeping the premises clean and in the removal of surplus and scrap materials, bulk waste and debris as herein before required. G. If a dispute arises between the Prime Contractors as to their responsibility for cleaning up as required by this section, the Department may authorize another Prime Contractor to perform the cleanup and charge the cost of it against the several Prime Contractors in an amount the Department determines to be appropriate. H. If the Contractor(s) Contractor fails to maintain a satisfactory cleanup program, the Department will issue a twenty-four (24) hour written notice of deficiency. If the Contractor does not respond to the written notice from the Department, then the Department shall arrange for the performance of the cleanup and backcharge the Contractor(s) Contractor for all costs associated with the cleanup. E. I. All construction salvage materials, not including items specified elsewhere to be returned to the Department, become the property of the Contractor and shall be taken from the premises. On-site storage of materials and equipment, other than for use in this Project, will not be permitted. F. J. No rubbish or debris shall be dropped from a height of more than six feet, or thrown out of any window or opening without a chute. G. K. Every day the site and premises shall be left in a neat, unobstructed condition, and all Work shall be in good repair and order. L. The following, which is not all-inclusive, lists the cleaning levels required by each Contractor as applicable to the scope of Work included in its Contract prior to Final Closeout Inspection: 1. Remove labels which are not required as permanent labels; 2. Clean transparent materials, including mirrors and window/door glass, to a polished condition; 3. Remove substances which are noticeable as vision-obscuring materials; 4. Clean exposed exterior and interior hard-surfaced finishes to a dirt-fee condition, free of dust, stains, paint splatters, films and similar noticeable distracting substances. Except as otherwise indicated, avoid disturbance of natural weathering of exterior surfaces. Restore reflective surfaces to original reflective condition; 5. Clean concrete floors; in non-occupied spaces, broom clean; remove all stains, marks, paint, rust, etc. caused by construction activities. 6. Clean plumbing fixtures to a sanitary condition, free of stains, including those resulting from water exposure; and 7. Clean mechanical and electrical equipment, ductwork and replace all filters. H. M. Prior to Final Closeout Inspection, in addition to the cleaning specified above, the site shall be prepared for occupancy by a thorough cleaning, including removal of all trash, rocks, wood and or debris as required. Roadways and sidewalks shall be washed and swept clean. These activities shall be coordinated by the Lead Contractor. I. N. Before the acceptance of the Project by the Department at the Final Closeout Inspection, all visible finished surfaces and materials shall be thoroughly cleaned and/or retouched by the responsible Contractor at its own cost and shall be left in a clean and unblemished condition to the satisfaction of the Department. Surfaces that are to be finished shall have all plaster, mortar and other surplus materials removed before beginning painting, varnishing and other finishing.

Appears in 1 contract

Sources: Construction Contract