Clarifications on Contractor Scope Sample Clauses

Clarifications on Contractor Scope. 1. Offer does not include fire protection for new blend and storage building 2. Offer does not include insulation and heat tracing for piggable piping except for all launching and receiving stations. 3. Valves and instruments on existing tanks will be reused as is. 4. Existing valves, traps and strainers on the steam and condensate branches to existing coils will remain as is. Mains are understood to be reused as is. CONTRACTOR will install branches to 7 existing tanks. 5. The floor in one tank will be replaced; any repairs to sidewalls would be done at an additional cost. 6. The reactor system design, steam requirements, and hot oil requirements have been specified by the OWNER. a) Following assumptions relating to civil work at plant site were made: • Soil at the site is free of any Toxic Contamination and/or any other environmentally unsafe chemical substances, and any under ground obstacles that may interfere with excavation of the site. CONTRACTOR price does not include any costs associated with special handling and disposal of such unsafe soils. • No Seismic Zone requirements or provisions are included in the CONTRACTOR price. • Since the upgrading work will be constructed within the existing plant facility, no allowance is included for site survey and coordinates verification. CONTRACTOR assumes this data is available at the plant. b) The Geotechnical Study performed by ▇.▇. ▇▇▇▇▇▇▇ Co. in August 2006, was used to prepare the quote for the civil work. c) Owner shall, at its own expense, apply for and obtain any required environmental permits from the proper authorities. CONTRACTOR role shall be limited to assisting owner in assembling technical information on an as needed basis for obtaining permits. d) Owner is responsible for any underground obstructions not on the drawings provided to CONTRACTOR e) Owner will pay for power used during the total construction period. The contractor will pay any costs associated with wiring, transformer, disconnects, etc. to provide such power. f) The tie-in to existing facilities and demolition and/or reconstruction of existing system will cause operation interruptions. The CONTRACTOR price does not include any temporary facilities required to avoid operation interruptions. It is assumed that the production activities will be planned and scheduled to make existing system available for modification/upgrade/tie-ins etc. based on a tie in schedule from the on-site Construction Manager. Any changes to the provided sche...
Clarifications on Contractor Scope. Offer does not include fire protection for new blend and storage building