Cement Concrete Sample Clauses

Cement Concrete. Cast iron soil and waste pipes under floor, in concrete slabs and in wall chases (When cut specially for the pipe) shall be incased in cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 stone aggregate 20mm size) 75 mm in bed and all- round. When pipes are running well above the structural slab, the encased pipes shall be supported with suitable cement concrete pillars of required height and size of intervals as directed by the Independent Engineer.
AutoNDA by SimpleDocs
Cement Concrete. In all reinforced concrete work, the mix of cement concrete shall be as per latest provisions of IS-456/2000, IS-3370 (Part 1 to IV) as approved by Engineer-In-Charge, with upto date amendments, on plate load theory.
Cement Concrete. (a) Placing of concrete shall start after the bottom of foundation is well dressed, watered and rammed by means of rammers. After laying and consolidation is completed, watering twice a day for a week from the next day shall be done. The measurements shall be exact to length, breadth and depth as per drawing.
Cement Concrete. Revise as follows: Section 704 except as follows: Delete Table A, Cement Concrete Criteria. Use the following criteria for HPC mix: · Select a range of water cementitious ratio, for the mix to be produced, from a maximum of 0.45 to a minimum of 0.40. · Sand Fineness Modulus Range = 2.6 to 3.1 · Minimum mix design 28 day compressive strength = 27.6 MPa (4000 psi) · A 28 day to 7 day compressive strength ratio of greater than or equal to 1.33
Cement Concrete. Revise “Cement Concrete” to “High Performance Concrete” and add the following: Reduction in payment due to deficiencies according to Section 110.1 as revised. Section 110.10(b) Definitions. Revised as follows:
Cement Concrete. Add the following paragraph: Add synthetic fibers to Class AA cement concrete for barriers and curbs. Provide synthetic fibers complying with ASTM C1116, Type III. Use 100% virgin polypropylene, fibrillated fibers containing no reprocessed olefin materials and specifically manufactured for use as concrete secondary reinforcement. Use a minimum of 1.5 pounds of fibers per cubic yard of cement concrete. Use fibers 3/4" in length. Provide a mix that is workable and one that does not contain fiber balls. Develop and submit the concrete mix design with fibers for Department review and approval at least 10 days prior to use. 00 - bNOTICE TO CONTRACTOR ‌ Addendum: Associated Item(s): Header: Provision Body: The South Two Lick Creek Bridge detour cannot be installed until detour is removed underneath the Buffalo and Pittsburgh Railroad bridge (at Segment 110). The detours for the roadway underneath the Buffalo and Pittsburgh Railroad Bridge and South Two Lick Bridge cannot both be in place at the same time. No detours are permitted to be in place from November 15 through March 15. Coordination with Xxxxx Paving will be required throughout the construction to utilize their gated entry to access the Temporary Access Road. Areas of the Temporary Construction Easement (T.C.E) will be shared with Xxxxx Paving to insure continued and unobstructed operation of their facility. Contractor is to establish contact with Lindy Paving prior to accessing Temporary Construction Easement and performing any temporary construction within the T.C.E. 00 - bSECTION 704 – CEMENT CONCRETE ‌ Addendum: Associated Item(s): Header: Provision Body: Section 704.1(b) MATERIAL. Revise as follows:

Related to Cement Concrete

  • Cement Cement to be used for the work shall comply the following and shall be used with the prior approval of Engineer -in -charge

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Dry Cleaning Timpson have over 520 dry cleaning stores and are now the UK’s biggest family-run dry cleaner. We process and clean up to 40,000 garments per week and have 32 Dry Cleaning production sites located around the UK. 19 of these sites are Timpson Super Hubs and act as satellite production centres. We offer customers a next day service on everyday items and quality check each garment before it leaves production. Dry Cleaning by Timpson See prices, opening times and more about dry cleaning and laundry services in , . From £2 per item. : Dry cleaning & laundry services DLS have the expertise to advise, design, supply, install & maintain your professional laundry equipment

  • Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.

  • Fueling delivering or dispensing fuel, defueling and refueling, or any other transfer of fuel on Airport property.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Fertilizer Purchaser shall evenly spread the fertilizer listed below on all exposed soil inside the grubbing limits at a rate of 200 pounds per acre of exposed soil. Fertilizer must meet the following specifications: Chemical Component % by Weight Sulphur 3 Inerts 49 SECTION 9 – POST-HAUL ROAD WORK 9-3 CULVERT MATERIAL REMOVED FROM STATE LAND Culverts removed from roads become the property of the Purchaser and must be removed from state land.

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.

  • Equipment Cleaning (a) Areas, known by Forest Service prior to timber sale advertisement, that are infested with invasive species of concern are shown on Sale Area Map. A current list of invasive species of concern and a map showing the extent of known infestations is available at the Forest Supervisor’s Office. For purposes of this provision, “Off-Road Equipment” includes all logging and construction machinery, except for log trucks, chip vans, service vehicles, water trucks, pickup trucks, cars, and similar vehicles.

Time is Money Join Law Insider Premium to draft better contracts faster.