Budget Description Sample Clauses

Budget Description a. Describe the composition and source of the matching funds. Also, indicate whether nonfederal matching funds have been secured or committed.
AutoNDA by SimpleDocs
Budget Description. A stipend of $500 is provided each SCRAP artist to cover liability insurance and any needed additional materials. The City will also pay for the SCRAP artist memberships to Idea FabLabs so the SCRAP Artists may have free access to tools and equipment.
Budget Description. Describe the proposed expenditures for each cost category in the budget table that follows. Your narrative should clearly identify the barriers and/or gaps CARES Act-Continuity of Education Equity- XXXX funding will mitigate or eliminate so that the target population identified in this application can participate in your continuity of education programs. Include any matching and/or in-kind supports (dollars, human capital, and/or other resources through the LEA or partner organizations) that will be leveraged toward plan implementation and achievement of your continuity of education goals. (limit 2500 characters) Solanco is a rural district with significant challenges. CEEG grant funding will be used to obtain traffic control personnel to minimize traffic congestion at the Quarryville Elementary and Providence Elementary Schools. As a result of social distancing requirements, the volume of parents driving their children to and from school has increased significantly, creating traffic congestion and potential safety concerns for students, staff and drivers. One traffic control monitor will be utilized at Providence Elementary in the mornings and two monitors will be utilized at Quarryville Elementary in the mornings. Two monitors will be utilized at both schools in the afternoon. The school district is assessed $80 per monitor per school day. The health and safety of Solanco students is paramount to the school district. The school district has purchased a large quantity of laptops, iPads and other technology devices for students in an effort to alleviate technology and accessibility gaps that exist for a multitude of our learners, including: students with a lack of access/limited access to devices, adaptive hardware to address specialized needs, software to address communication needs and devices that aid in overcoming language barriers. The district has deployed devices and hardware in an effort to mitigate any potential barriers to learning/instruction during this time, but additional resources are still needed. Instructional software, monitors, flashdrives and other miscellaneous ancillary technology supplies will be purchased with XXXX funding to provide remote student instruction. Additional work hours for technology staff is being funded by the XXXX xxxxx to deploy, support and maintain the additional technology devices.
Budget Description. Describe the proposed expenditures for each cost category in the budget table that follows. Your narrative should clearly identify the barriers and/or gaps CARES Act-Continuity of Education Equity- XXXX funding will mitigate or eliminate so that the target population identified in this application can participate in your continuity of education programs. Include any matching and/or in-kind supports (dollars, human capital, and/or other resources through the LEA or partner organizations) that will be leveraged toward plan implementation and achievement of your continuity of education goals. (limit 2500 characters) Due to the fact that 100% our student population does not have equal access to the educational programs offered by the Northern Cambria School District, in-so-far as interactivity is concerned, the purchase of the Mimio devices will be instrumental in fostering student engagement. The installation of these devices in every classroom assures full access by in- school and synchronous learners. The implementation of laptops to used by students in underserved or non existent internet areas would allow for travel to wireless hotspots or allow for downloading on necessary content that can then be viewed and completed at home, and then uploaded to the district system for teachers to review, grade, and/or provide feedback.
Budget Description. Continued funding for this project will come from the Xxxxx County Solid Waste Management District with support from The University of Toledo. The university will supply some student support funding at the graduate level and contribute to laboratory space and overhead indirect costs. Budgets for 2021, 2022, 2023, 2024, and 2025 are attached. Below is a budget summary. Budget Request Projections 2016 through 2020: Source 2021 2022 2023 2024 2025 Total LCSWMD $90,000 $90,000 $90,000 $90,000 $90,000 $450,000 Univ. Toledo $91,780 $92,222 $92,675 $91,143 $93,626 $463,477 Total $181,780 $182,222 $182,626 $183,143 $183,626 $913,447 Requested funding will be sufficient to support three graduate student assistants and two undergraduate upper classmen students. These students will perform fieldwork at company sites and perform research in the laboratory. There will be faculty involvement in an overseer and research capacity by Xx. Xxxxxxx Xxxxxxxxxx as the Principal Investigator. Requested funding also will allow students and the Principal Investigator to travel to attend solid waste conferences and share success stories and promote Xxxxx County and the District.

Related to Budget Description

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 9312 Single Lane / Level 1 NFSR 300 0.00 END 0.40

  • Brief Description Identification of the device: mirror, camera/monitor, other device 2/ Device for indirect vision of Class I, II, III, IV, V, VI, S 2/ Δ Symbol 2m as defined in paragraph 6.1.3.1.1. of this Regulation: yes/no 2/ Annex 3

  • General Description Employer shall provide Employee with the compensation, incentives, benefits, and business expense reimbursement specified elsewhere in this agreement.

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • ITEM DESCRIPTION Equipment (include VIN, make, model, year, serial no., accessories, or other identifying features): 12. NO. OF OPERATORS PER SHIFT 13. HRLY/ DAILY/ MILEAGE SHIFT BASIS 14. SPECIAL 15. GUARANTEE (8 HOURS) Rate Unit Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $75 Daily Ea. Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $45 Daily Ea. Accessible Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $95 Daily Ea. Accessible Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $65 Daily Ea.

  • Short Description Post-Bachelor's

  • Overtime Description Overtime Wage paid at time and one half the regular rate For "A" rated Apprentices (work in excess of 7 hours per day) For "M" rated Apprentices (work in excess of 8 hours per day) (Local #3) ELEVATOR CONSTRUCTOR‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 2) Elevator (Constructor) - First Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $26.94 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $28.41 Elevator (Constructor) - Second Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $27.35 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $28.84 Elevator (Constructor) - Third Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $28.17 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $29.69 Elevator (Constructor) - Fourth Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $29.00 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $30.54 (Local #1) ELEVATOR REPAIR & MAINTENANCE‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 2) Elevator Service/Modernization Mechanic (First Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Benefit Per Hour: $26.87 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Benefit Per Hour: $28.34 Elevator Service/Modernization Mechanic (Second Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Benefit Per Hour: $27.27 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Benefit Per Hour: $28.76 Elevator Service/Modernization Mechanic (Third Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Benefit Per Hour: $28.08 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Benefit Per Hour: $29.60 Elevator Service/Modernization Mechanic (Fourth Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Benefit Per Hour: $28.89 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Benefit Per Hour: $30.43 (Local #1) ENGINEER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 5) Engineer - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.68 Supplemental Benefit Rate per Hour: $22.55 Engineer - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $29.60 Supplemental Benefit Rate per Hour: $22.55 Engineer - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $32.56 Supplemental Benefit Rate per Hour: $22.55 Engineer - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $35.52 Supplemental Benefit Rate per Hour: $22.55 (Local #15) ENGINEER - OPERATING‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 5) Operating Engineer - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour 40% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 Operating Engineer - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 Operating Engineer - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 (Local #14) FLOOR COVERER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Floor Coverer (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 (Carpenters District Council) XXXXXXX‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Xxxxxxx (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $13.64 Effective 11/1/2015 - Supplemental Rate Per Hour: $13.79 Xxxxxxx (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $22.97 Effective 11/1/2015 - Supplemental Rate Per Hour: $23.13 Xxxxxxx (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $25.87 Effective 11/1/2015 - Supplemental Rate Per Hour: $26.03 Xxxxxxx (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $31.04 Effective 11/1/2015 - Supplemental Rate Per Hour: $31.29 (Local #1281) HEAT & FROST INSULATOR‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Heat & Frost Insulator (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 40% of Journeyperson's rate Heat & Frost Insulator (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Heat & Frost Insulator (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 70% of Journeyperson's rate Heat & Frost Insulator (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 80% of Journeyperson's rate (Local #12) HOUSE WRECKER‌ (TOTAL DEMOLITION) (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) House Wrecker - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $21.17 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $22.32 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.97 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.53 Supplemental Benefit Rate per Hour: $17.33 (Xxxxx Tenders District Council) IRON WORKER - ORNAMENTAL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Iron Worker (Ornamental) - 1st Ten Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $36.50 Iron Worker (Ornamental) - 11 -16 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $37.62 Iron Worker (Ornamental) - 17 - 22 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $38.73 Iron Worker (Ornamental) - 23 - 28 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 70% of Journeyperson's rate Supplemental Rate Per Hour: $40.97 Iron Worker (Ornamental) - 29 - 36 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $43.20 (Local #580) IRON WORKER - STRUCTURAL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 6) Iron Worker (Structural) - 1st Six Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $25.48 Supplemental Benefit Rate per Hour: $46.83 Iron Worker (Structural) - 7- 18 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.08 Supplemental Benefit Rate per Hour: $46.83 Iron Worker (Structural) - 19 - 36 months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.68 Supplemental Benefit Rate per Hour: $46.83 (Local #40 and #361) LABORER (FOUNDATION, CONCRETE, EXCAVATING, STREET PIPE LAYER & COMMON)‌ (Ratio Apprentice to Journeyperson: 1 to 1, 1 to 3) Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - First 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Second 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Third 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Fourth 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 90% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 (Local #731) MARBLE MECHANICS‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Cutters & Setters - First 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 50% of Journeyperson's rate NO BENEFITS PAID DURING THE FIRST TWO MONTHS (PROBATIONARY PERIOD) Cutters & Setters - Second 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 55% of Journeyperson's rate Cutters & Setters - Third 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 65% of Journeyperson's rate Cutters & Setters - Fourth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 75% of Journeyperson's rate Cutters & Setters - Fifth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 85% of Journeyperson's rate Cutters & Setters - Sixth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 95% of Journeyperson's rate Polishers & Finishers - First 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 50% of Journeyperson's rate NO BENEFITS PAID DURING THE FIRST TWO MONTHS (PROBATIONARY PERIOD) Polishers & Finishers - Second 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Polishers & Finishers - Third 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 75% of Journeyperson's rate Polishers & Finishers - Fourth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 90% of Journeyperson's rate (Local #7) XXXXX TENDER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Xxxxx Xxxxxx - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $21.39 Supplemental Benefit Rate per Hour: $18.44 Xxxxx Xxxxxx - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $22.54 Supplemental Benefit Rate per Hour: $18.44 Xxxxx Xxxxxx - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $24.29 Supplemental Benefit Rate per Hour: $18.49 Xxxxx Xxxxxx - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.95 Supplemental Benefit Rate per Hour: $18.49 (Local #79) METALLIC LATHER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Metallic Lather (First Year -Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $29.41 Supplemental Benefit Rate per Hour: $22.89 Metallic Lather (Second Year - Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $34.01 Supplemental Benefit Rate per Hour: $24.54 Metallic Lather (Third Year - Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $39.07 Supplemental Benefit Rate per Hour: $25.69 Metallic Lather (First Year -Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.01 Supplemental Benefit Rate per Hour: $17.95 Metallic Lather (Second Year - Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $28.11 Supplemental Benefit Rate per Hour: $17.95 Metallic Lather (Third Year - Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $33.21 Supplemental Benefit Rate per Hour: $17.95 (Local #46) MILLWRIGHT‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Xxxxxxxxxx (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $27.23 Supplemental Benefit Rate per Hour: $34.06 Xxxxxxxxxx (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $32.18 Supplemental Benefit Rate per Hour: $37.62 Xxxxxxxxxx (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $37.13 Supplemental Benefit Rate per Hour: $41.83 Xxxxxxxxxx (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $47.03 Supplemental Benefit Rate per Hour: $48.31 (Local #740) PAVER AND ROADBUILDER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Paver and Roadbuilder - First Year (Minimum 1000 hours) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $27.05 Supplemental Benefit Rate per Hour: $17.12 Paver and Roadbuilder - Second Year (Minimum 1000 hours) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $28.69 Supplemental Benefit Rate per Hour: $17.12 (Local #1010) PAINTER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Painter - Brush & Roller - First Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $15.80 Supplemental Benefit Rate per Hour: $11.88 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $16.40 Supplemental Benefit Rate per Hour: $12.13 Painter - Brush & Roller - Second Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $19.75 Supplemental Benefit Rate per Hour: $15.73 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $20.50 Supplemental Benefit Rate per Hour: $15.98 Painter - Brush & Roller - Third Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $23.70 Supplemental Benefit Rate per Hour: $18.64 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $24.60 Supplemental Benefit Rate per Hour: $18.89 Painter - Brush & Roller - Fourth Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $31.60 Supplemental Benefit Rate per Hour: $24.02 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $32.80 Supplemental Benefit Rate per Hour: $24.27 (District Council of Painters) PAINTER - STRUCTURAL STEEL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Painters - Structural Steel (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 40% of Journeyperson's rate Painters - Structural Steel (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Painters - Structural Steel (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 80% of Journeyperson's rate (Local #806) PLASTERER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Plasterer - First Year: 1st Six Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $15.76

  • Topic Description Licensee Responsibilities Licensee must:  Take appropriate steps to ensure the security, integrity, and confidentiality of Confidential Information and must comply with all relevant applicable laws and regulations, including laws protecting borrower privacy.  Not disclose Confidential Information to third parties, without Xxxxxx Mae’s prior written approval, except on a need‐to‐know basis to Licensee’s partners, Topic Description affiliates, officers, employees, directors, contractors, counsels, agents or representatives, provided they are subject to confidentiality obligations at least as stringent as those set forth in this Section A3.  Not use Confidential Information in any way that could be viewed as a conflict of interest, a breach of confidentiality or privacy, or the gaining of an unfair advantage from the relationship with Xxxxxx Xxx.  Implement commercially reasonable measures meeting or exceeding industry standards to ensure the security, integrity, and confidentiality of Confidential Information, including using industry‐standard encryption for data in transit and virus checking programs designed to prevent the transmission and receipt of viruses and other malicious code, implementing appropriate disaster recovery and back‐up procedures, implementing appropriate procedures to prevent disclosure of data and other materials to a party other than the intended recipient, and employing methods for securely disposing or destroying such information.  These measures must meet, at least, the same level of protection that the Receiving Party seeks for its own information of a similar nature.  Licensee must collaborate with Xxxxxx Mae in assessing the sufficiency of these measures and Licensee’s information security program, upon reasonable request.  Instruct its Related Parties who may receive Confidential Information about the requirements of this Section A3, and the processes and procedures necessary to comply with them.  Comply with all reasonable security policies and procedures required by Xxxxxx Xxx related to the access and use of Xxxxxx Mae’s systems or any Licensed Materials.  Not transmit to Xxxxxx Mae’s systems any materials that contain bugs, viruses, worms or other functions, routines, devices or instructions which may create any unauthorized access or damage to, or interruption in the functioning of, the Licensed Application or Xxxxxx Mae’s systems. Restrictive Legends  Licensee must abide by and reproduce and include any restrictive legend or proprietary rights notice that appears in or on any Confidential Information of Xxxxxx Xxx or any Third‐Party Licensor (or other third‐party owner) that it is authorized to reproduce.  Licensee also agrees that it will not remove, alter, cover or distort any trademark, trade name, copyright or other proprietary rights notices, legends, symbols or labels appearing on or in any Confidential Information of Xxxxxx Mae or any Third‐Party Licensor (or other third‐party owner). Required Actions in Case of Data Breach  Licensee must address any Data Breach with prompt and effective corrective action, including cooperation with Xxxxxx Xxx in the investigation and remediation of such Data Breach, as well as prompt disclosure and notification where legally required; and  Licensee must promptly notify Xxxxxx Mae of any Data Breach in writing ‐‐ at xxxxxxx_xxxxxxxxxxxx@xxxxxxxxx.xxx ‐‐ and must take all steps reasonably requested by Xxxxxx Xxx to mitigate the consequences of such Data Breach.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

Time is Money Join Law Insider Premium to draft better contracts faster.