BEFORE AND AFTER DREDGING CROSS SECTIONS Sample Clauses

BEFORE AND AFTER DREDGING CROSS SECTIONS. 9.02.05.01 Before and after dredging cross sections of the channel shall be taken at approximately 50-foot intervals. 9.02.05.02 A layout of the before dredging cross sections shall be prepared on the survey tracking chart and approved by the Contracting Officer. This layout shall also be used in performing the required after dredging surveys. 9.02.05.03 After dredging cross sections shall be taken at the same locations as the before dredging surveys. The actual location of each sounding taken on each before and after dredging cross section range shall be provided. This information shall be in the form of printout tabulation giving the actual distance of the soundings from the baseline on an azimuth normal to the centerline of the cut. Soundings shall be to the nearest 0.25-foot referred to the water surface. This information shall also be plotted on a printout sheet, along with a section showing the required dredging dimensions. In addition, a plan view shall also be plotted on a printout sheet showing the actual location of each sounding taken on each "before" dredging cross section range.